Choosing and Tracking KPIs
Pick a handful of measures that show whether your unit is doing its job, define each one so it is counted the same way every time, and read the weekly trend without overreacting.
Table of contents
A KPI, or key performance indicator, is a number you track because it tells you whether your unit is doing its job. The monthly P&L tells you how the money came out, weeks after the fact. KPIs tell you this week whether orders go out right, whether people get hurt, whether customers wait, and whether work gets done on time. Pick the right few, count them honestly, and they show problems while you can still fix them.
What You Will Be Able to Do
- Choose a handful of KPIs that match what your unit is for.
- Write a definition for each one so everyone counts it the same way.
- Turn counts into rates, so weeks of different sizes compare fairly.
- Read a run chart and tell a real change from a normal bump.
- Set targets from your own history, and keep the numbers honest.
Start With What Your Unit Is For
Before you pick a single number, write down what your unit exists to do, in one or two sentences. A pickup counter gets correct orders to customers quickly. A maintenance shop keeps equipment running safely. A housekeeping team turns rooms clean and on time. Then pick measures for each part of that job.
| Area | Example KPIs |
|---|---|
| Safety | Recordable injury rate, near misses reported, safety walks done |
| Quality | Orders right the first time, rework, complaints per 1,000 orders |
| Service | Share done on time, wait time, calls returned the same day |
| Cost | Labor hours per unit, supplies cost per order, budget variance |
| People | Turnover, unplanned absences, training finished on time |
| Volume | Orders, units shipped, rooms cleaned, patients seen |
Every industry also has its own KPIs, such as sales conversion in a store or equipment effectiveness in a plant. When your company already defines one, use its definition so your numbers compare with other units.
Leading and Lagging Measures
A lagging measure shows a result after it happened: injuries, monthly profit, turnover, complaints. A leading measure tracks something you do now that drives the result later.
| Lagging result | Leading measure that drives it |
|---|---|
| Injury rate | Hazards reported and fixed, safety walks done |
| Customer complaints | Orders checked before handoff |
| Equipment breakdowns | Preventive maintenance done on schedule |
| Turnover | New hires who finish training on time |
| Late orders | Orders started by the cutoff time |
Track some of each. Lagging measures tell you whether you won. Leading measures tell you what to do about it this week.
Define It So Nobody Can Argue
Two leads counting "late orders" two different ways will argue about the number instead of fixing the problem. Write a short definition card for every KPI.
| Field | Example: order accuracy |
|---|---|
| What it shows | Whether customers get exactly what they ordered |
| Formula | Orders with an error / total orders x 1,000 |
| What counts as an error | Missing, wrong or extra item, found by staff or customer |
| Data source | Error log at the counter, plus orders from the order system |
| Period | Weekly, Sunday through Saturday |
| Owner | Each shift lead updates it by Monday noon |
| Target | Set from the last 8 weeks, as shown below |
Notice the error rule counts errors staff catch before handoff, not only the ones customers report. If you count only complaints, the number depends on how many customers bother to call.
Turn Counts Into Rates
Counts go up when volume goes up, even when the work gets better. Divide by volume to compare fairly.
Worked example. Week 1 had 6 errors on 1,500 orders. Week 2 had 8 errors on 2,400 orders.
- Week 1: 6 / 1,500 x 1,000 = 4.0 errors per 1,000 orders.
- Week 2: 8 / 2,400 x 1,000 = 3.3 errors per 1,000 orders.
The count went up, but the rate went down. Week 2 was better. A rate "per 1,000" is easier to read than a percent here. As accuracy, week 1 was 99.6 percent and week 2 was 99.7 percent, which look almost the same.
Injury Rate
The U.S. Bureau of Labor Statistics (BLS) figures injury and illness rates this way:
Rate = number of recordable cases x 200,000 / total hours worked by all employees.
The 200,000 stands for 100 full-time employees working 40 hours a week for 50 weeks. So the result reads as cases for every 100 full-time workers over a year, which lets a small unit compare with a large one.
Worked example. Your unit had 3 recordable cases last year, and payroll shows 86,400 hours worked.
- 3 x 200,000 = 600,000.
- 600,000 / 86,400 = 6.9.
BLS publishes these rates for each industry every year from its Survey of Occupational Injuries and Illnesses, so you can compare with a real figure for your type of work. Which cases count as recordable is set by OSHA's recordkeeping rule. Your safety lead or whoever keeps the OSHA 300 log decides that, not you.
Small units swing hard. At 86,400 hours, each single case moves the rate by about 2.3. One bad year does not prove a trend.
Turnover
A common way to figure turnover for a year:
Turnover = people who left / average headcount x 100.
Worked example. You started the year with 40 employees and ended with 44, so the average is (40 + 44) / 2 = 42. Nine people left. Turnover is 9 / 42 x 100 = 21.4 percent.
Ask HR how your company counts. Some leave out seasonal staff or transfers to other units. BLS publishes monthly separation rates by industry in its Job Openings and Labor Turnover Survey (JOLTS). Those are rates for one month, so compare them with a month, not a year.
Units Per Labor Hour
Units per labor hour = units handled / labor hours. If the team handled 31,000 units on 1,240 labor hours, that is 31,000 / 1,240 = 25 units per labor hour. Use whatever the unit is: cases picked, rooms cleaned, orders packed or calls handled.
Choose Your Handful
Most units do well with about five to eight KPIs. More than that, and nobody remembers them. Your company may require some, so start with those. For the rest, check each one:
- It matters. It ties to what the unit is for.
- Your team can move it. If nothing anyone does changes it, it is not your KPI.
- The data is reliable and easy to get. If it takes three hours to count, it will not get counted.
- People understand it. You can explain it in one sentence.
- It is balanced. Pair speed with accuracy, and cost with quality, so improving one does not wreck the other.
A balanced set for a pickup counter might be: orders per labor hour, share of orders ready on time, errors per 1,000 orders, near misses reported, and training finished on time.
Read the Trend, Not the Week
One week's number bounces around for many reasons. Plot each week in order on a run chart, a simple line chart with time along the bottom. Draw a line at the median, the middle value when you sort the weeks from low to high.
Worked example. Errors per 1,000 orders for the first 8 weeks were 4.2, 3.8, 4.5, 3.9, 5.8, 4.4, 3.7 and 4.0.
- Sort them: 3.7, 3.8, 3.9, 4.0, 4.2, 4.4, 4.5, 5.8.
- With 8 values, the median is halfway between the 4th and 5th: (4.0 + 4.2) / 2 = 4.1.
- Week 5, at 5.8, is a single high point. Ask what happened that week, such as three new people starting at once. Do not rebuild the process over one week.
Then the team added a check at handoff. The next 6 weeks were 3.1, 2.9, 3.3, 3.0, 2.8 and 3.2. All six sit below the old median of 4.1.
Quality teams in healthcare and elsewhere use simple run chart rules. A common one: six or more weeks in a row on the same side of the median is a real shift, not chance. Points that land exactly on the median do not count toward the six or break the run. Another: five or more points in a row, each higher than the last (or each lower) is a trend. By these rules, the six weeks after the change show a real improvement.
Setting Targets
Set targets from numbers you can stand behind:
- Your own history. The median of recent weeks is your starting point.
- Your budget. Cost KPIs should line up with what the budget assumes.
- Company goals. Use them when your company sets them.
- Published data you can cite. BLS injury rates for your industry are one example.
Do not copy a target from a website that gives no source. A target your team has no chance of hitting gets ignored. One that is too easy changes nothing. Set it a step beyond your current median, and raise it when the team gets there.
Many units color each KPI green, yellow or red. Write down what each color means before you use it, such as green at or better than target, yellow within a set range of it, and red beyond that.
Keep the Numbers Honest
Any number tied to praise or blame invites people to move the number instead of the work.
| Pressure | How the number gets gamed | Guard against it |
|---|---|---|
| Fewer injuries | Injuries go unreported | Reward reporting and fixing hazards |
| Faster calls | Callers get cut off | Pair speed with a resolved-call measure |
| Fewer late orders | Promise dates get padded | Measure against the customer's requested date |
| Lower supply cost | Needed supplies run out | Track stockouts alongside cost |
Warning: Never set up a safety goal or reward that makes people afraid to report an injury. OSHA's recordkeeping rule at 29 CFR 1904.35 requires a reporting procedure that does not deter or discourage reporting, and bars any retaliation against an employee for reporting a work-related injury or illness.
Spot-check your data now and then. Watch the work, pull a sample of records, and ask the team whether the number matches what they see.
A Weekly KPI Routine
- Each owner updates the KPIs by the same time every week.
- Post them where the team can see them, with the trend, not just this week.
- Review them with your leads in 10 to 15 minutes.
- Pick one KPI that needs action. Name an owner, a step and a date.
- Next week, check whether the step happened and what the number did.
Common Mistakes
| Mistake | What it costs |
|---|---|
| Tracking 20 numbers | Nobody knows which ones matter |
| Comparing counts across weeks of different volume | Busy weeks look bad, slow weeks look good |
| No written definition | Arguments over the number instead of the work |
| Reacting to one bad week | Changes that fix nothing and confuse the team |
| Only lagging measures | You learn about problems after the damage |
| One measure with no partner | People hit the number and hurt something else |
Check Your Understanding
1. Week A had 12 late deliveries out of 600. Week B had 15 out of 1,000. Which week was better?
Week A was 12 / 600 = 2.0 percent late. Week B was 15 / 1,000 = 1.5 percent. Week B was better, even with more late deliveries.
2. A crew had 2 recordable cases and 120,000 hours worked in a year. What is its injury rate?
2 x 200,000 / 120,000 = 3.3 cases for every 100 full-time workers.
3. Errors per 1,000 orders usually run near 4. This week they hit 7. What do you do?
Find out what happened that week, and fix it if there is a clear cause. One point is not a trend, so keep watching before you change the whole process.
4. A team gets a pizza party for every month with zero injuries. A worker hides a cut to keep the streak alive. What is wrong, and what do you change?
The reward is teaching people to hide injuries, which is what OSHA's rule on reporting procedures warns against. Reward leading actions instead, such as hazards reported and fixed, and make sure the injured worker gets care.
5. Average headcount was 24, and 6 people left during the year. What is the turnover?
6 / 24 x 100 = 25 percent.
Key Takeaways
- Start from what your unit is for, and choose about five to eight KPIs that cover safety, quality, service, cost and people.
- Write a definition card for each KPI: formula, what counts, data source, period, owner and target.
- Turn counts into rates so weeks of different sizes compare fairly.
- Read the trend on a run chart. One week is not a trend, but six in a row on one side of the median is a shift.
- Set targets from your own history, your budget and published data you can cite.
- Pair measures and spot-check the data so the number reflects the work.