Controlling Labor Cost and Overtime

15 min read Training Guide

Figure labor cost percent and sales per labor hour, build a weekly labor budget from a forecast, track it each day, and plan overtime instead of finding it on payday.

Table of contents

Labor is the cost you control most directly as a supervisor. Every hour you schedule or approve is money. Controlling it means putting hours where the work is, catching overtime early and explaining the numbers when they miss. It never means cutting pay for work already done. Every hour worked is paid, and non-exempt employees earn at least 1.5 times their regular rate for hours over 40 in a workweek. Those rules belong to payroll. Your part is the plan.

What You Will Be Able to Do

  • Figure labor cost percent, sales per labor hour and labor hours per unit.
  • Build a weekly labor budget in hours from a sales or volume forecast.
  • Track actual hours against the budget each day and act by midweek.
  • Spot overtime before it happens and decide when it is worth paying.
  • Choose fair, legal ways to flex hours when the work drops off.

Three Ways to Measure Labor

Measure Formula Best when
Labor cost percent Labor dollars ÷ sales x 100 Your unit has sales
Sales per labor hour (SPLH) Sales ÷ labor hours You want to see productivity apart from pay rates
Labor hours per unit Labor hours ÷ units of work Work is counted in orders, rooms, cases or visits

"Labor dollars" means different things at different companies. It can be hourly wages only, wages plus overtime, or wages plus payroll taxes and benefits, which is often called loaded labor. Some budgets include salaried managers and some do not. Ask your manager or finance which definition your budget uses, and use the same one every time.

Worked Example: One Week at a Restaurant

A restaurant had $48,000 in sales for the week. Hourly staff worked 640 hours, and their wages came to $11,520.

  • Labor cost percent: $11,520 ÷ $48,000 x 100 = 24.0%.
  • Sales per labor hour: $48,000 ÷ 640 = $75.00.
  • Average cost of an hour: $11,520 ÷ 640 = $18.00.

The two measures tell you different things. If everyone gets a raise, labor cost percent goes up even though nobody works slower, but SPLH stays the same. If sales jump because of a holiday, labor cost percent drops even if the schedule was badly built. Read them together.

Worked Example: A Warehouse

A warehouse shipped 2,400 orders using 300 labor hours. That is 300 ÷ 2,400 = 0.125 labor hours for each order, or 2,400 ÷ 300 = 8 orders for every labor hour. A hotel does the same with rooms cleaned, and a clinic with patient visits.

There Is No Universal Right Number

The right labor percent depends on the type of business, its prices, local pay and how much work is done by hand. A figure from another company or online is not your target. Yours comes from your own budget and history.

Build a Weekly Labor Budget

  1. Start with the forecast for the week, in sales or units.
  2. Get the target from your budget. It may be a labor percent, an SPLH goal or hours per unit.
  3. Turn the target into dollars, then hours.
  4. Take out the fixed hours, which you need at any volume: opening and closing coverage, key holders, qualified roles and required meetings or training, which are paid time.
  5. Spread the remaining variable hours across the days by each day's share of the forecast.

Worked Example: From Forecast to Hours

A store forecasts $52,000 in sales next week. Its own budget sets labor at 23% of sales, and the average cost of an hour for its hourly staff, with shift differentials, is $18.40.

  1. Labor dollars: $52,000 x 0.23 = $11,960.
  2. Labor hours: $11,960 ÷ $18.40 = 650 hours.
  3. Fixed hours: 210 for opening, closing and key holder coverage, plus 12 for the weekly training session, for 222.
  4. Variable hours: 650 - 222 = 428.
  5. Saturday is forecast at 20% of the week's sales, so it gets 0.20 x 428 = about 86 variable hours, on top of its share of the fixed hours.

If the budget uses SPLH instead, the math is shorter. At an SPLH goal of $80.00, the store earns $52,000 ÷ $80.00 = 650 hours.

The mix matters too. Fill the schedule with your longest-serving, highest-paid people and the same 650 hours cost more than $11,960. Watch the dollars as well as the hours.

Track It Every Day

Each day, compare three numbers: hours actually worked (from the time system), hours you scheduled and hours the budget allowed. Compare sales or units with the forecast too.

Worked Example: The Midweek Check

The 650-hour budget planned 280 hours for Monday through Wednesday. On Thursday morning you check:

  • Hours used Monday through Wednesday: 290.
  • Hours still scheduled Thursday through Sunday: 375.
  • Projected total: 290 + 375 = 665, which is 15 over budget.
  • Sales Monday through Wednesday came in about 4% under forecast.

You have four days left to act. Trim 15 hours from the slowest forecast hours Thursday and Friday. By the time the weekly report arrives, the hours are spent.

Flex the Budget When Volume Changes

A fixed budget can mislead you. If sales come in under forecast, you should use fewer hours. If they come in over, you will need more. Earned hours are the hours the actual volume supports. At an SPLH goal of $80.00, a week that ends at $49,400 in sales earns $49,400 ÷ $80.00 = 617.5 hours. Comparing actual hours with earned hours shows how well you flexed, whatever the forecast said.

Find Overtime Before It Happens

Overtime is counted by the fixed workweek, at 1.5 times the regular rate, and the regular rate includes shift differentials and promised bonuses. Payroll figures it. You control whether it happens.

Worked Example: What Six Hours Cost

An employee with a regular rate of $20.00 is on track for 46 hours. The 6 overtime hours cost 6 x $30.00 = $180.00. The same 6 hours worked by a part-timer with a regular rate of $17.00 who is at 24 hours for the week cost 6 x $17.00 = $102.00. Moving those hours, if the part-timer is qualified and available, saves $78.00.

Run an overtime check twice a week, once when you post the schedule and once midweek. For each person, add the hours worked so far to the hours still scheduled. Anyone heading past 40 needs a decision now.

Common cause Fix
Call-outs covered by full-timers Call part-timers or a standby list first
Shifts that keep running long Find out why, such as a late delivery or a closing task, and fix the cause
Schedule built over 40 by mistake Total each person before posting
Training or meetings added to a full week Schedule them inside the week's hours
Shift swaps that push someone over Require approval for every swap
Long shifts in a daily-overtime state Watch the daily limit, such as 8 hours in California

Overtime is sometimes the right call. Only one person may be qualified for a task. A missed deadline may cost more than the premium. A short spike may not justify a new hire. Decide it ahead of time and approve it.

Warning: If someone works overtime you did not approve, pay it. You can address the broken rule separately, but removing the hours from the time card is a wage violation.

Flex Hours When the Work Drops

When volume falls short, work through these options in order:

  1. Move the work. Use slow hours for the planned off-peak tasks: restocking, deep cleaning, training, preventive maintenance, filing.
  2. Ask for volunteers. Some people are glad to leave early.
  3. Release by a set rule. If you must send people home, use the order your policy sets and apply it the same way each time.
  4. Fix next week. Adjust the next schedule to the new forecast.

Check the law before you cut a shift that has already started or been posted:

  • Reporting time pay. Some states require minimum pay when a worker reports and is sent home. In California, a worker who reports and gets less than half the scheduled day's work is paid for half the scheduled day, at least 2 hours and no more than 4, at the regular rate, with some exceptions.
  • Scheduling laws. In some cities and states, cutting or changing a posted shift owes extra pay. In Seattle, for example, a covered employee sent home early is paid for half of the hours not worked.

Never trade legal rights for budget hours. Do not ask anyone to clock out and finish the job, skip a required break or work through a meal. Do not drop below a safety or licensing minimum, such as a two-person close, a staffing ratio or a qualified operator. If the budget and a minimum conflict, take it to your manager.

Explain the Variance

When labor misses the budget, report the reason in numbers, then what you will change. For example: "Labor ran 18 hours over. Sales were 5% under forecast, and two call-outs were covered with 11 overtime hours. Next week I am adding a part-timer to the call list and cutting the Tuesday close by one person."

Common Mistakes

Mistake What it costs
Cutting peak hours to hit the percent Lost sales, which raises next week's percent
Reading labor percent without sales A big sales week hides a bad schedule
Using another company's number as a target A target that fits nobody
Waiting for the weekly report Hours already spent
Shaving time or off-the-clock work Back wages, damages and lost trust

Check Your Understanding

1. A unit had $36,000 in sales and $9,000 in hourly labor across 450 hours. What are its labor cost percent and SPLH?

Labor cost percent is $9,000 ÷ $36,000 x 100 = 25%. SPLH is $36,000 ÷ 450 = $80.00.

2. Your budget allows 500 hours. Through Wednesday you used 230, and 290 more are scheduled. What do you do, and when?

The projection is 520, which is 20 over. Act now: trim 20 hours from the slowest remaining hours, and check whether the forecast for the rest of the week has changed.

3. A closer stayed 45 minutes past the schedule to finish a cash count, and it pushed her to 40.75 hours. You did not approve it. What happens to the time?

It is paid, including the overtime. You can coach her or fix the reason the close ran long, but you cannot remove the time.

4. Labor percent dropped from 26% to 21% during a holiday week with no change in the schedule. Did the crew get more productive?

Not necessarily. Sales rose, so the same hours are a smaller share of them. Check SPLH and compare actual hours with earned hours before you give credit.

Key Takeaways

  • Labor cost percent is labor dollars ÷ sales x 100. SPLH is sales ÷ labor hours. Read them together.
  • Your target comes from your own budget and history, not someone else's benchmark.
  • Turn the forecast into hours, take out fixed hours, then spread the rest by each day's share.
  • Check hours and projected overtime by midweek, while there is time to act.
  • Plan overtime and approve it ahead. Pay every hour worked, approved or not.
  • Flex hours by moving work, asking for volunteers and fixing next week, within reporting time and scheduling laws.