Estimating Small Repair Jobs
Scope a small repair job, estimate time and materials, choose hourly, flat-rate or minimum pricing, set a rate that covers your costs, and write a quote that gets you paid for all the work.
Table of contents
Small jobs are where handymen most often lose money. A "quick" faucet repair turns into two trips to the store, a seized shutoff valve and an hour of cleanup, and the customer was quoted for twenty minutes. The fix is not to guess higher. It is to see the job before you price it, count every minute it really takes, know what your time costs, and put the scope in writing. The dollar amounts below are examples to show the math. Use your own costs, rates and records.
What You Will Be Able to Do
- Scope a small job by asking the right questions and seeing the work before you price it
- Estimate time and materials, including travel, setup, supply runs and cleanup
- Choose hourly, flat-rate or minimum-charge pricing for each job
- Set a billing rate that covers your costs, and use markup and margin correctly
- Write a quote and handle changes so you get paid for all the work
Scope the Job First
Most bad estimates come from not knowing what the job is. Ask before you price:
- What exactly needs doing? "Fix the bathroom" is not a scope. "Toilet runs, faucet drips, caulk is moldy" is.
- Can you see it? Ask for photos of the problem and the area around it, including the shutoff valve, the wall or the parts involved.
- Who supplies the parts? If the customer bought a fixture, ask for the model so you can check what it needs.
- What is the access like? Ceiling height, ladder needs, parking, stairs, pets and whether the area is cleared.
- When was the home built? Before 1978 means lead paint rules if you disturb painted surfaces.
- Who approves and pays? A tenant often cannot approve work for the landlord.
- Is it allowed? Check that the job is inside your license and permit limits before you quote it.
Photos or a visit? Photos work for simple, well-defined jobs, such as mounting a shelf or replacing a flapper. Go see anything that could hide damage, such as rot, leaks, old wiring or soft floors, and any job with several tasks.
Price the unknowns. Decide ahead how you will handle what you cannot see. Rotted wood behind trim, a stripped hinge screw hole that needs a fix, a shutoff valve that will not close. Write it as an option with its own price, an allowance, or a clear line that says you will stop and call before doing extra work.
Estimate Your Time
The work itself is only part of the time a job takes.
| Time | Often forgotten? |
|---|---|
| Travel to and from the job | Yes |
| Setting up and protecting the home | Yes |
| The work | No |
| Supply runs for parts you did not have | Yes |
| Waiting for compound, caulk or paint to dry | Yes, and it may mean a second visit |
| Testing, cleanup and walk-through | Yes |
| Paperwork and payment | Yes |
Dry times change the plan. Drywall patches need a second coat after the first dries, and then sanding, priming and paint. Tub caulk needs the old joint fully dry, often overnight, and the new silicone needs its cure time before the tub is used. If a job needs a second visit, the second trip has travel and setup too.
The first time you do a task, it takes longer. Write down how long each task actually took, every time. After a few months, your own list of task times is the best estimating tool you have.
Count the Materials
- List every part and its quantity.
- Add the consumables you will use up, such as caulk, screws, anchors, blades, tape and sandpaper.
- Look up the current price from your supplier.
- Add any delivery or disposal fees.
- Add a markup on materials. It pays for the time spent buying, returns, and the risk of standing behind the part.
If the customer supplies the parts, say in writing that your warranty covers your work, not the part.
Choose How to Price
| Method | Best for | What to watch |
|---|---|---|
| Hourly plus materials | Troubleshooting and jobs you cannot see into | Give a range or a not-to-exceed amount, so the customer is not surprised |
| Flat rate for the task | Jobs you do often and know well, such as mounting a TV | You take the risk if it runs long, so base it on your records |
| Minimum charge or trip fee | Very small jobs | Say it up front, before you drive out |
| Half-day or full-day block | A list of small tasks | The customer ranks the list, and you work down it |
The minimum charge. Every visit costs travel, setup and cleanup, even if the repair takes ten minutes. Say replacing a flapper takes 30 minutes of work, plus 30 minutes of travel, 15 of setup and 15 of cleanup. That visit is 1.5 hours of your day, so price it as 1.5 hours, not 30 minutes. A minimum charge that covers a visit's fixed time keeps tiny jobs from costing you money.
Know What Your Time Costs
Working for yourself, the rate you bill has to pay your business costs, your self-employment tax and yourself, from the hours you can actually bill. You cannot bill the time spent driving between jobs, writing estimates, buying parts or doing the books.
Worked Example: Setting a Billing Rate
These numbers are made up for the example.
| Item | Amount for a week |
|---|---|
| Business costs: vehicle, fuel, insurance, tools, phone, ads | $400 |
| Your goal for your own earnings, before income tax | $1,000 |
| Self-employment tax set-aside, 15.3 percent of $1,000 | $153 |
| Total the week's billing must bring in | $1,553 |
Self-employment tax is 15.3 percent, figured on most of your net earnings, so setting aside 15.3 percent of the full amount is a safe estimate. Say you work 40 hours, but only 25 of them are billable. $1,553 / 25 = $62.12, so you round up to a $65 hourly rate. If you set your rate by dividing by 40 hours instead, you would fall short every week.
Markup Is Not Margin
Markup is profit as a percentage of your cost. Margin is profit as a percentage of the price. If a job costs you $300 and you want 25 percent of the price to be profit, charge $300 / 0.75 = $400. A 25 percent markup only gets you to $375, which is a 20 percent margin.
Worked Example: A Four-Task Visit
A homeowner sends this list with photos:
- The hall toilet runs.
- Two doorknob holes in the drywall, each about 3 inches across.
- Mount a 55-inch TV on a wood-stud wall, using the mount they bought.
- Recaulk the tub, where the old caulk is moldy.
The home was built in 1995, so lead rules do not apply. The customer has leftover wall paint labeled with the color.
Plan the visits. The patches need a second coat and then sanding and paint. The old tub caulk must come out and the joint must dry before new caulk goes in. So this is two visits.
| Visit 1 | Hours |
|---|---|
| Travel | 0.5 |
| Setup and protecting the home | 0.25 |
| Toilet: new flapper and fill valve | 0.75 |
| Drywall: patches and second coat with setting-type compound | 0.75 |
| Mount the TV into studs | 1.0 |
| Cut out old caulk, clean and leave the joint to dry | 0.75 |
| Cleanup | 0.25 |
| Visit 1 total | 4.25 |
| Visit 2, the next day | Hours |
|---|---|
| Travel | 0.5 |
| Sand, prime and paint the patches | 0.75 |
| Caulk the tub | 0.5 |
| Cleanup and walk-through | 0.25 |
| Visit 2 total | 2.0 |
Labor: 6.25 hours x $65 = $406.25
Materials: fill valve and flapper kit $28, two patch kits $16, setting compound $12, a quart of primer $16, two tubes of silicone caulk $22, caulk remover $10, and screws and small parts $8. That is $112. With a 20 percent markup, $112 x 1.20 = $134.40.
Total: $406.25 + $134.40 = $540.65, quoted as $541.
Write down the assumptions that the price depends on: the TV goes on studs at the spot shown, the toilet shutoff valve works, and the touch-up uses the customer's paint. If the shutoff valve will not close, or there are no studs where the TV must go, you will stop and give a price for that before going further.
Write the Quote
Put every quote in writing, even a small one. A text or email can work if it has everything below.
- Your business name and contact details, plus any license or registration number your area requires
- The customer's name, the address and the date, and how long the price stands
- Each task, in plain words, with its price
- Who supplies which materials
- Assumptions, and what is not included
- Whether this is an estimate, your best guess where the final bill can differ, or a quote, a fixed price for a set scope. For an estimate, give a range or a not-to-exceed amount
- The schedule, including any second visit
- Payment terms. Some states limit deposits on home repair work, so check yours
- Your workmanship warranty, if you give one
- The customer's approval
Your state may have its own rules about what a home repair contract must say and how a customer can cancel. Learn them before you write your first quote.
Handling Changes
When you find something new during the job:
- Stop before you do the extra work.
- Show the customer what you found, with a photo if they are not home.
- Explain the options and give a price for each.
- Get approval in writing, even a text, from the person who pays.
- Add it to the invoice as a separate line.
Doing extra work first and asking for payment later is how small jobs turn into disputes.
Common Mistakes
| Mistake | What it costs |
|---|---|
| Pricing from a phone call | Surprises you pay for |
| Pricing only the work, not the visit | Travel, setup and cleanup for free |
| Forgetting dry times | A second trip you did not charge for |
| Dividing your costs by 40 hours | A rate that falls short every week |
| Doing extras without approval | Arguments and unpaid invoices |
| Never comparing estimates to actual time | Repeating the same pricing mistakes |
Check Your Understanding
1. A customer asks for a price to "fix a few things in the kitchen." What do you do before you give a number?
Ask what each item is and get photos, or visit. Write a specific scope, task by task, before you price it.
2. Your weekly costs and earnings goal add up to $1,800, and you can bill about 24 hours a week. What hourly rate do you need?
$1,800 / 24 = $75.
3. You quoted a door adjustment. When you take the hinge off, you find the jamb is rotted behind it. What do you do?
Stop, show the customer, explain the options and the price for each, and get written approval before you repair the rot.
4. Why does a flat rate for mounting a TV make sense for some handymen but not for a new one?
A flat rate is only safe when you know from your own records how long the task takes. A new handyman does not have those records yet, so hourly with a not-to-exceed amount is safer until they do.
Key Takeaways
- Scope the job in writing, and see anything that could hide damage before you price it.
- Count travel, setup, supply runs, dry times and cleanup, not just the work.
- Use a minimum charge so tiny jobs cover the cost of the visit.
- Set your rate from your costs, taxes and goal, divided by the hours you can really bill.
- Get written approval before doing any extra work.