Installing Asphalt Shingles
Lay out chalk lines, install the starter course, set the offset pattern, nail every shingle in the right zone, and build closed-cut and open valleys and cap shingles that hold up in wind.
Table of contents
Shingling looks simple: lay a row, nail it, lay the next. The skill is in the details nobody sees once the roof is done. A nail half an inch too high, a joint lined up with the one below, a corner left unclipped in a valley: each one can turn into a blow-off or a leak years later, long after the crew has left. Experienced roofers are fast because they set up the lines and patterns first and then repeat them without thinking.
This guide covers laminated (architectural) shingles on a prepared deck with drip edge, ice barrier and underlayment already installed. Shingle makers differ on exposure, offsets, nail placement and starter strips, and following their printed instructions is what keeps the warranty. Numbers below marked "one maker" come from a major maker's instructions for its laminated shingle. Read the wrapper for the product on your roof. The 2021 International Residential Code (IRC) sets minimums that every maker must meet.
What You Will Be Able to Do
- Read a shingle wrapper and find the numbers that change from product to product.
- Snap layout lines so courses stay straight and parallel.
- Install a starter course and set an offset pattern that keeps joints apart.
- Nail every shingle in the nailing zone, flush and straight.
- Build a closed-cut valley and an open metal valley, and install cap shingles.
Read the Wrapper First
These numbers change from product to product. Check each one before the first bundle goes up.
| Item | Why it matters |
|---|---|
| Exposure | Sets course spacing and coverage. One maker's laminated shingle uses 5-5/8 inches |
| Offset pattern | Keeps joints from lining up |
| Nailing zone | The only place nails hold properly |
| Nails per shingle | 4 at minimum by code, 6 for high wind or enhanced warranties |
| Starter product | Puts sealant along the eave and rake |
| Cold-weather and steep-slope rules | When you must hand seal |
| Cap shingles | Which ridge product the warranty requires |
The code minimums: at least 4 fasteners per strip shingle (R905.2.6), corrosion-resistant roofing nails with at least a 12-gauge shank and 3/8-inch head, long enough to go 3/4 inch into the deck or through it (R905.2.5). Above 21:12, which is close to vertical, the maker's special instructions apply.
Handling and Loading
- Store bundles flat, covered and ventilated. One maker sets a storage limit of 110°F.
- Shingles are brittle when cold and soft when hot. Do not drop bundles on their edges, bend them over your shoulder, or slam them on each other to separate them.
- Spread bundles across the roof. One maker says not to load them across a hip or ridge, where they bend.
Layout Lines
Chalk lines keep courses straight even when the eave is not.
- Check the eave and ridge. Measure from the eave to the ridge at both ends of the roof. If the numbers differ, the roof is out of parallel, and you will have to decide with your lead where to take up the difference.
- Snap horizontal lines. Mark the top edge of the first course, then mark course lines up the roof at the exposure. One maker calls for a check line about every 6 courses at minimum, and many crews snap every course or two on long roofs.
- Snap a vertical line. Near the middle of the roof, snap a line square to the eave. Check it with a 3-4-5 triangle, or 6-8-10 for more accuracy. Vertical lines keep the offset pattern from drifting sideways as you work across.
Worked Example: Planning the Top Course
A slope measures 15 feet 8 inches from the drip edge to the ridge, or 188 inches. The exposure is 5-5/8 inches.
- 188 / 5.625 = 33.4 exposures.
- That is 33 full courses, plus about 0.4 x 5.625 = 2-1/4 inches at the top.
- Lay a 34th course and trim its top at the ridge, where the cap shingles will cover it.
- Count the courses at both ends of the roof. A difference of a whole course means the ridge and eave are not parallel, so you and your lead must decide where to take up the difference before you reach the top.
Starter Course
The starter course sits under the first row of shingles along the eave. It covers the joints and cutouts in the first course and puts a strip of sealant near the eave to hold the first course down in wind.
- Use the maker's starter product. A field shingle laid upside down puts the sealant at the wrong edge.
- Set it to overhang the eave and rake. One maker calls for 1/4 to 3/4 inch past the edge.
- Keep the sealant strip near the eave edge.
- Nail it where the maker shows. One maker places starter nails about 1-1/2 to 3 inches above the bottom edge.
- Offset its joints from the first course so no joint lines up.
Many makers also call for starter along the rakes, sealant down, to hold the rake edges in wind. Some require it for their enhanced warranties.
Field Shingles and Offsets
Offset is the sideways distance between the joints in one course and the joints in the next. Too small an offset lets water find its way down through joint after joint.
One maker's pattern for its laminated shingle, starting at the rake:
| Course | Trim from the rake end of the first shingle |
|---|---|
| 1 | None, full shingle |
| 2 | 6 inches |
| 3 | 11 inches |
| 4 | 17 inches |
| 5 | Start over with a full shingle |
Each course after the first lines up its bottom edge with a mark or cutout on the course below, which sets the exposure. Overhang the first course past the eave and rake to cover the starter, as the maker says.
Racking means running shingles straight up the roof in columns instead of working across in steps. Some makers allow it for some products and others warn against it because it can show color patterns or misalign offsets. Follow the wrapper.
Nailing
The nail holds the shingle and the top of the shingle below it. Laminated shingles have two layers glued together in a band, and nails in that band go through both layers plus the top of the course underneath.
- Location. Drive nails in the marked nailing zone. One maker places 4 nails about 6-7/8 inches up from the bottom edge, or 6 nails for enhanced wind coverage. Makers commonly keep the end nails about 1 inch in from each end.
- Depth. Flush with the surface. An overdriven nail cuts into the mat and loses holding power. An underdriven nail holds the shingle up so it cannot seal, and it can back out.
- Angle. Straight. An angled nail leaves one side of the head raised and tears the shingle on the other.
- Exposure. Never leave a nail where water or the next course will not cover it.
Set the nail gun depth on a scrap shingle at the start of the day, and check again as the sun warms the roof, because hot shingles are softer. If a nail goes in too deep, follow the maker's fix. A common one is to seal the head and drive another nail beside it in the zone.
High nailing is the most common cause of blow-offs. A nail above the zone misses the course underneath, so the lower shingle hangs on its sealant alone.
Sealing and Weather
Shingles have a strip of sealant that bonds to the course below once the sun warms it. If the shingles go on during a long cold spell, or dust gets on the strip before it seals, the shingle may never bond.
Hand sealing. When the wrapper calls for it, put spots of shingle adhesive under each tab. One maker calls for 4 quarter-sized dabs per shingle, about 1 inch up from the bottom edge, and warns to keep asphalt cement thinner than 1/8 inch, because too much blisters the shingle and softens the underlayment.
Steep slopes. At 21:12 and steeper, such as a mansard, one maker moves the nails lower and requires hand sealing.
Valleys
Valleys carry the most water on the roof. The valley lining goes in first, and nails stay out of the center.
Closed-Cut Valley
- Lining. Center self-adhering membrane in the valley. One maker calls for a full-width roll with no fasteners within 6 inches of the centerline.
- Starter across. Run the starter course across the valley about 12 inches onto the other side.
- First side. Shingle one side through the valley, running each shingle at least 12 inches past the centerline. Press it into the valley before nailing so it does not bridge, and add an extra nail at the upper end of each shingle that crosses. Keep every nail at least 6 inches from the centerline.
- Second side. Run the shingles from the other roof over the first side's shingles in the valley.
- Cut line. Snap a line on the second side, 2 inches back from the valley centerline, and cut the overlying shingles on it. One maker requires the overlying shingles to end 2 inches from the center.
- Clip and seal. Clip the upper corner of each cut shingle at 45 degrees, so water running down the valley cannot turn under it. Seal the cut edges with asphalt cement as the maker says.
Open Metal Valley
In an open valley, the metal stays exposed and the shingles stop short on both sides.
- Metal width. The IRC requires open metal valley lining at least 24 inches wide (R905.2.8.2). One maker allows 20 inches. Use at least 24 inches where the IRC applies.
- Fastening. Hold the metal at its edges with nails beside it, not through it, so it can move.
- Shingle lines. One maker starts the shingles 6 inches apart at the top of the valley and widens the gap 1/8 inch per foot toward the eave, so the valley can carry more water at the bottom.
- Corners. Clip the upper corners at 45 degrees and set the shingle ends in asphalt cement.
Worked example. An open valley runs 16 feet along the slope. The gap starts at 6 inches at the top and widens 1/8 inch per foot. At the bottom it is 6 + (16 x 1/8) = 8 inches. Snap each line 3 inches from center at the top and 4 inches from center at the bottom.
Hips and Ridges
- Use the cap shingles the maker specifies, set at the exposure on their wrapper.
- Cap shingles stack more layers, so use nails long enough to reach 3/4 inch into the deck or go through it.
- Work hips from the bottom up, then the ridge. Point the laps away from the prevailing wind.
- With a ridge vent, cut the slot to the width the vent maker gives, stop it where they say, and use their nail length through the vent.
Fixing Problems
| Problem | Likely cause | Fix |
|---|---|---|
| Shingles lifting after a storm | High nailing or unsealed strip | Renail in the zone, hand seal |
| Nail heads showing | Nails placed below the zone or crooked | Pull, seal the hole, renail correctly |
| Joints lining up | Offset pattern skipped | Remove and relay that section |
| Courses wandering | No chalk lines | Snap lines, correct over the next courses |
| Leak at valley | Nail near center, or unclipped corners | Rework the valley |
| Ripples across the roof | Wrinkled underlayment | Fix the underlayment before shingling |
Check Your Understanding
1. You are shingling in a week of 30°F days. What do you check on the wrapper, and why?
The cold-weather sealing rule. The sealant strip may not bond in prolonged cold, so the maker may require hand sealing with dabs of adhesive.
2. A helper's nails are landing 1 inch above the nailing zone. What happens over time?
The nails miss the course below, so the lower shingles depend on sealant alone and can blow off in high wind.
3. On a closed-cut valley, a coworker nails each crossing shingle 3 inches from the valley center. What is wrong?
Nails must stay at least 6 inches from the centerline on that maker's valley, because the center carries the most water.
4. An open valley is 20 feet long. The gap is 6 inches at the top and widens 1/8 inch per foot. How wide is it at the bottom?
6 + (20 x 1/8) = 8.5 inches.
Key Takeaways
- Read the wrapper before you start, because exposure, offsets, nailing and starter rules vary.
- Snap horizontal and vertical lines so the courses and offsets stay true.
- Use a real starter strip with its sealant at the eave.
- Nail flush, straight and in the zone, with at least 4 nails and 6 where required.
- Keep valley nails at least 6 inches from the center, and clip cut corners at 45 degrees.
- Hand seal when the maker requires it for cold weather or steep slopes.