Cut base cabinets for plumbing and power, shim them level to the line, join them into a straight run, scribe fillers and end panels to the wall, and anchor an island.

Table of contents

Base cabinets carry the countertop, the sink full of water, the dishwasher and anyone who leans on the counter. They have to be level so the top sits flat, straight so the countertop edge runs true, and rigid so nothing rocks. A countertop installer will judge your work in the first minute by laying a level across the boxes.

This guide picks up after layout. The high point of the floor is found, the base line is on the wall (often 34-1/2 inches above the high point), and the studs are marked. Follow the cabinet maker's instructions for screws, joining and the toe kick.

What You Will Be Able to Do

  • Measure and cut cabinet backs and bottoms for pipes and boxes.
  • Set a corner cabinet square to both walls and level to the line.
  • Shim base cabinets level front to back and side to side, and join them into a straight run.
  • Scribe a filler or end panel to a wall that is not straight.
  • Anchor an island to the floor.

Cut for Utilities First

Cut every hole a cabinet needs before it goes in. Cutting inside a cabinet that is already set is slow, and it is easy to hit a pipe.

  1. Measure from the wall corner, or from the edge of the cabinet beside it, to the center of each pipe or box. Then measure up from the floor where the cabinet will sit.
  2. Subtract the shim height if the cabinet will sit on shims, since the cabinet back moves up with it.
  3. Transfer the marks to the cabinet back or bottom, measured from the same edge.
  4. Cut with a hole saw about 1/2 inch larger than the pipe, so the pipe can pass with room to adjust. Cut a larger opening for a drain or a cluster of lines with a jigsaw.
  5. Test-fit by sliding the cabinet in before you fasten anything.

Worked Example: Locating a Drain Hole

The drain stub is 47 inches from the left wall and 17-1/4 inches up from the floor below it. The sink base will sit with its left side 36 inches from the left wall, on a 1/4-inch shim, because this spot is 1/4 inch lower than the floor's high point.

  • Across: 47 - 36 = 11 inches from the cabinet's left side.
  • Up: 17-1/4 - 1/4 = 17 inches up from the bottom edge of the cabinet back.
  • Cut a 2-inch hole for the 1-1/2-inch drain.

Measure twice. A hole in the wrong spot in a finished back shows every time someone opens the sink cabinet.

Warning: Water and power must be off before cabinets slide over the stubs. Do not move, extend or reconnect a drain, supply or electrical box to make a cabinet fit. That is work for the licensed plumber or electrician.

Set the Corner Cabinet

Most runs start in a corner, because the corner sets the angle and the height for everything else.

  1. Set the corner cabinet in place and push it to the walls.
  2. Shim it up to the base line at the front and back of each side. Put shims under the side panels, which carry the load, not in the middle of the bottom.
  3. Level it side to side and front to back, and check that the face frame is plumb.
  4. Square it to both walls. If the corner is out of square, set the cabinet square to the main run and let the gap fall at the back, where the countertop covers it.
  5. For a blind corner cabinet, set the pull-out distance the plan shows, so the door on the next cabinet can open past the corner.
  6. For a corner lazy susan, add a support strip on the wall at the base line, as many makers call for, since the open corner gives the countertop nothing else to sit on.
  7. Fasten it to the studs through the back rail with cabinet screws, but leave them slightly loose until the next cabinet is joined.

Shim and Join the Run

  1. Set the next cabinet tight to the first and shim it to the line.
  2. Clamp the face frames flush at the top and front, and screw them together through the stiles with the screws the maker calls for, often three #8 x 2-1/2-inch screws on base cabinets. Drill a pilot first.
  3. Lay a 4-foot or 6-foot level across the tops of the joined cabinets, side to side and front to back. Every cabinet in a run should come to the same height.
  4. Hold the level against the face frames horizontally. It shows whether the run is straight or bowed.
  5. Shim behind the back at the studs wherever there is a gap, so screwing to the wall does not pull the cabinet out of line.
  6. Fasten through the back rail into studs. Drive each screw until the rail just meets the shim. Then fully tighten the cabinet before it.
  7. Trim the shims flush with a utility knife or an oscillating tool once the cabinet is fastened.

Shimming Tips

  • Use composite shims under sink bases and dishwashers, since wood shims can rot or swell if a leak soaks them.
  • Stack two tapered shims in opposite directions to get a flat, parallel shim.
  • A cabinet that rocks is not supported. Add a shim until it sits solid, then check level again.
  • Over about 3/4 inch of shim, a cabinet needs more support than a couple of shims at the corners. Some crews build a level base frame from lumber first. Ask your lead.

Fillers and End Panels

Scribing

Scribing means marking the shape of a wall onto a filler, end panel or countertop so you can cut it to fit tight against that wall.

  1. Set the filler or panel in place, plumb and level, with its edge against the wall.
  2. Find the widest gap between the piece and the wall.
  3. Set a compass or scribe tool to that gap.
  4. Run the point along the wall while the pencil marks the piece. Keep the scribe level so it marks the same distance everywhere.
  5. Cut to the line with a jigsaw, then plane or sand to it. Cut a slight back bevel, so only the front edge touches the wall.
  6. Test-fit and repeat until the piece meets the wall along its full length.

Worked Example: Scribing a Filler

A 3-inch filler next to a wall shows a 3/8-inch gap at the top and a 1/16-inch gap at the bottom, because the wall leans away. Set the scribe to 3/8 inch and run it down the wall. The line runs from 3/8 inch in at the top to nothing at the bottom. Cut, and the filler meets the wall tight from top to bottom, about 2-5/8 inches wide at the top and 2-15/16 inches at the bottom.

End Panels and Dishwasher Panels

  • Finished end panels go on exposed sides. Fasten them from inside the cabinet with screws short enough not to come through.
  • A dishwasher end panel at the end of a run gives the countertop support and the dishwasher something to fasten to. Set it plumb, level with the base tops, and fasten it to the floor or wall as the maker shows.
  • Leave the dishwasher opening at the width on the spec sheet, measured at the front and the back, and keep the full height under the countertop.

Appliance Openings

  • Check each opening at the top, middle and bottom. A cabinet that leans makes an opening narrower at one end.
  • Leave room for water, drain and power to pass between the sink base and the dishwasher, through holes cut in the cabinet side.
  • A freestanding range sits between cabinets, and its anti-tip bracket mounts to the floor or wall as its instructions show. The range installer usually handles that, but do not block where it goes.

Islands and Peninsulas

An island has no wall to screw into, so it is anchored to the floor.

  1. Snap the island's outline on the floor, square to the main run and at the distances the plan shows.
  2. Check the floor under it for high points the same way as the walls.
  3. Screw cleats, short blocks of 2x lumber, to the floor just inside the outline, where the cabinet sides and toe kick will land.
  4. Set the cabinets over the cleats, shim them level, join them, and screw through the cabinet sides or toe kick into the cleats.
  5. Fasten the back panel or end panels. Peninsulas also fasten to the cabinets they join.

Warning: Before you screw into the floor, find out what is below it: radiant heat tubing, water lines, ducts or wiring. A screw through a radiant tube under tile is an expensive leak. Ask the plan or the owner, and check from the basement if you can.

Island outlets and wiring are installed by the electrician. Cut openings only where the plan and the electrician show them.

Toe Kick

The toe kick is the recessed strip at the bottom of the cabinet front that gives your feet room. Many cabinets have it built in. Others get a separate board.

  • Install it after the cabinets are fastened, so it covers the shims.
  • Scribe it to the floor if the floor is uneven.
  • Leave it off around the dishwasher and appliances until they are in.

Ready for the Countertop

Before anyone templates or installs a top:

  1. All cabinets are fastened to studs and to each other.
  2. The tops are level and in one plane along every run, checked with a long level.
  3. No cabinet rocks or moves when you push on it.
  4. Support strips are in at corners and open spans.
  5. Fillers, end panels and appliance openings are finished.

Common Mistakes

Mistake What it costs
Shimming under the middle of the bottom Box sags at the sides, countertop rocks
Cutting holes after setting the cabinet Slow cuts and damaged pipes
Screwing to the wall before joining frames Face frames that will not pull flush
No back shims on a hollow wall Twisted boxes and doors that will not line up
Wood shims under a sink Rot and swelling after the first leak
Narrow dishwasher opening Dishwasher will not slide in

Check Your Understanding

1. A base cabinet rocks slightly when you push on one corner. It is level. Is it ready?

No. It is not fully supported. Add a shim at the corner that moves until it sits solid, then check level again.

2. A filler shows a 1/4-inch gap at the top and touches the wall at the bottom. What do you set the scribe to?

1/4 inch, the widest gap. Run it down the wall and cut to the line.

3. You need to anchor an island on a tile floor in a house with in-floor heat. What do you do first?

Find out where the heat tubing runs before driving any screws, from the plans, the owner or below the floor. Place the cleats where they will miss it.

4. A drain stub is 10 inches from the edge of a sink base and 16 inches up. What size hole do you cut for a 1-1/2-inch drain?

About 2 inches, roughly 1/2 inch larger than the pipe, centered on the measured spot.

Key Takeaways

  • Cut utility holes before setting, measured from the same edges as the pipes.
  • Start in the corner, square and level to the line.
  • Shim under the sides and behind at the studs, then join face frames flush before fastening to the wall.
  • Scribe fillers and end panels to the wall, and keep appliance openings full size.
  • Anchor islands to cleats, after checking what is under the floor.