Fiber cement siding is made from cement, sand and wood fiber pressed into planks and panels. It does not rot, burn easily or get eaten by bugs, and it holds paint for years. It is also heavy, brittle until it is nailed up, and full of crystalline silica, the dust that causes silicosis. The skills that matter on a fiber cement crew are cutting without breathing that dust, nailing without cracking or crushing the plank, and keeping it away from standing water.

The numbers in this guide come from one major maker's published installation instructions and from OSHA's silica rule for construction. Makers differ, and they revise their instructions. Read the current instructions for the product on the job, because the warranty depends on following them, and follow local code where it is stricter.

What You Will Be Able to Do

  • Store, carry and handle fiber cement so it arrives on the wall uncracked.
  • Cut it using an OSHA Table 1 method and clean up without dry sweeping.
  • Blind nail lap siding at the right spot, depth and spacing.
  • Keep the clearances to grade, roofs, decks and flashing that the maker requires.
  • Treat butt joints, trim gaps and cut edges so water stays out.

Before You Start

  • Check the wall. A water-resistive barrier (WRB) is required behind fiber cement, and all window and door flashing must be finished. One major maker requires framing no more than 24 inches on center. The wall should be flat and the studs straight.
  • Store it right. Keep it flat, off the ground, dry and covered. Wet planks shrink as they dry, and that opens gaps at butt joints after installation.
  • Carry it on edge. A long plank carried flat can snap under its own weight. Carry it on edge, with two people on long pieces, and set it down gently.
  • Plan access. Fiber cement is heavy to hold overhead. Use scaffolding, pump jacks or a lift above the first floor, and follow your fall protection plan.
  • Old siding: if you are tearing off old siding on a pre-1978 home, lead-safe rules may apply. Old cement siding shingles may contain asbestos. Do not break or cut them until someone qualified has checked.

Cutting and Dust Control

Cutting fiber cement with a power saw throws fine silica dust. OSHA's silica standard for construction, 29 CFR 1926.1153, has a list called Table 1 that spells out safe methods for common tasks. If you follow the Table 1 method exactly, the employer does not have to measure your exposure for that task.

For handheld power saws cutting fiber cement board, with a blade 8 inches or smaller, Table 1 says:

  • Use the saw outdoors only.
  • Use a dust collection system made for the saw, with the airflow the tool maker recommends or more.
  • Use a filter that is 99 percent efficient or better.
  • No respirator is required by Table 1 when you do all of that.

Cutting fiber cement with a power saw indoors is not covered by Table 1, so the employer would have to assess and control the exposure some other way. In practice, crews avoid it.

Method Dust Best use
Circular saw with fiber cement blade and dust collection, outdoors Low when the collection runs Straight cuts, rips, stacks of planks
Fiber cement shears, electric or pneumatic Very little Cuts on the wall, curves, thinner products
Score and snap with a carbide knife Very little Short straight cuts on thin pieces
Saw with no dust collection Heavy Never
  • Set up the cut station downwind of the crew and away from open windows and doors.
  • Use the right blade. Fiber cement blades have a few diamond-tipped teeth and last far longer than wood blades. Wood blades dull fast and make more dust.
  • Clean up wet or with a HEPA vacuum. OSHA's silica rule does not allow dry sweeping or compressed air for cleaning silica dust when wetting or HEPA vacuuming would work.
  • Wear safety glasses for every cut, and hearing protection with power saws.

Warning: Do not cut fiber cement with a bare saw and no dust collection, even for one cut. Silica damage to the lungs is permanent and builds up over years, and the dust is too fine to see.

Fasteners

Rule Detail
Type Corrosion-resistant, hot-dipped galvanized recommended
Near salt water Stainless steel
Not allowed Aluminum nails, clipped-head nails or staples for blind nailing lap siding
Depth Snug and flush with the surface
Angle Straight, not slanted

Use the nail size and length the maker lists for your framing and sheathing. With a nail gun, a flush-mount attachment or careful depth setting keeps nails from sinking in.

Nail Depth

  • Flush: right. The head sits snug against the plank without breaking the surface.
  • Under-driven: the head stands proud and keeps the next course from lying flat. Finish it with a hammer.
  • Over-driven: the head breaks into the plank and holding power drops. The maker's fix is to add another nail nearby. Do not pull it out and re-drive it in the same hole.

Blind Nailing Lap Siding

Blind nailing means the nail goes near the top of a plank, where the next course covers it. It is the most common way to fasten fiber cement lap siding, and it hides every nail.

  1. Install trim and flashing first. Corner boards, window trim, and Z-flashing at horizontal trim go on before the planks.
  2. Install a starter strip. Nail a 1-1/4-inch strip of fiber cement along the bottom of the wall so the first course tips out at the same angle as the rest.
  3. Set the first course. Its bottom edge goes on the level starting line, lapping past the starter strip.
  4. Nail into each stud. Drive one nail per stud, 3/4 inch to 1 inch below the top edge of the plank. Keep nails at least 3/8 inch from the ends of each plank.
  5. Do not high nail. A nail too close to the top edge can break out or miss the framing behind the sheathing, and the plank can work loose.
  6. Lap the next course. Each plank must lap the one below it by at least 1-1/4 inches. Siding gauges hold the exposure steady.
  7. Check level every few courses, and measure down from the top at both ends of the wall.

Face nailing goes through the visible face of the plank, near its bottom edge. One major maker allows it only where code or high-wind design requires it, and says not to mix blind nailing and face nailing on the same wall. The repair method for a single board can be an exception the maker allows.

Worked Example: Ordering Planks

A wall is 32 feet long and 9 feet tall, with two windows that are each 3 feet wide and 5 feet tall. You are installing 12-foot planks, 8-1/4 inches wide, at a 7-inch exposure.

  • Wall area: 32 x 9 = 288 square feet.
  • Windows: 2 x 3 x 5 = 30 square feet. The net area is 288 minus 30, or 258 square feet.
  • Coverage per plank: 12 feet long x 7 inches showing, which is 12 x 7 / 12, or 7 square feet.
  • Planks: 258 / 7 = 36.9, so 37 planks.
  • Waste: add about 10 percent for cuts and breakage. 37 x 1.1 = 40.7, so order 41.

Clearances

Fiber cement wicks water up into its edges if it sits in it. Clearances keep the bottom edge out of splash and standing water. These are from one major maker's instructions for lap siding. Check the current instructions for your product, since some editions differ.

Location Clearance
Finished grade 6 inches
Roofs At least 1 inch, more in some editions
Decks, steps, paths, slabs and driveways 1 inch
Gutter ends at a wall 1 inch
Horizontal Z-flashing 1/4 inch, left open
  • Kickout flashing is required where a roof eave meets a wall. It turns water away from the siding and into the gutter.
  • Grade should slope away from the house, and planting beds and mulch must not creep up to the siding.
  • Do not caulk the gap above Z-flashing, the bottom edges of planks, or the bottom of drip caps. Those gaps let water out.

Joints and Gaps

Butt Joints

Where two planks meet end to end, set the ends in moderate contact. Do not force them tight. Then treat the joint with one of the methods the maker and code allow:

  • Joint flashing: a strip of flashing behind the joint, recommended by one major maker.
  • Sealant: a sealant the maker lists, applied to the joint.
  • H-jointer: a metal or plastic joint cover.

Stagger butt joints so they do not line up from course to course.

Gaps at Trim

Where planks meet corner boards, window trim or other trim, leave the small gap the maker lists and seal it. One major maker calls for a sealant that meets ASTM C920, Grade NS, Class 25 or higher, or an acrylic latex caulk that meets ASTM C834.

Cut Edges

Field-cut edges and ends are raw. Seal, prime or paint every cut edge the way the maker requires before or soon after installation.

Finishing

  • Primed products: one major maker calls for factory-primed planks to be painted within 180 days.
  • Paint: use a 100 percent acrylic exterior paint. Do not use stain or oil-based paint on that maker's primed products.
  • Factory-finished products: touch up cuts and nicks with the maker's touch-up kit, and do not paint over them without checking the warranty.

Common Mistakes

Mistake What happens
Planks left uncovered in the rain Shrinkage opens butt joints after it dries
Carrying long planks flat Planks snap or crack
Cutting without dust collection Silica exposure and an OSHA violation
Dry sweeping dust Silica back in the air
Nails over-driven Holding power drops, planks can loosen
High nailing Nails miss framing or break out
Siding tight to roofs, decks or soil Edges wick water, swell and fail
Caulking the Z-flashing gap Water trapped behind the siding
Unsealed cut edges Water enters the raw edge
Joints stacked in a line Visible seams and leak paths

When to Stop

  • Rotted sheathing or framing under old siding. Damaged sheathing gets replaced before new siding goes on, and damaged framing goes to the supervisor or a qualified carpenter.
  • Wires or pipes in the way of a fastener or a cut. Stop and get the right trade.
  • No dust collection on the saw. Stop cutting until it is fixed.

Check Your Understanding

1. Rain is coming, and it is too late to finish the wall. A coworker wants to leave the open pallet in the yard. What do you do?

Cover it and keep it off the ground. Wet fiber cement installed later shrinks as it dries, and butt joints open up.

2. The saw's vacuum hose is cracked and it barely pulls. Can you finish the last few cuts?

No. Table 1 requires a working dust collection system. Switch to shears for small cuts, or stop until the vacuum is fixed.

3. A plank's nails are sinking 1/16 inch below the surface. What do you do?

Adjust the gun's depth so nails stop flush. For each over-driven nail, add another nail nearby, because the over-driven one has lost holding power.

4. You are siding a wall above a deck. How far above the deck surface should the bottom of the siding stop?

About 1 inch, per one major maker, but check the instructions for your product. The siding must stay out of standing water and splash.

Key Takeaways

  • Cut outdoors with a saw that has working dust collection, or use shears, and never dry sweep.
  • Store planks flat, dry and covered, and carry them on edge.
  • Blind nail one nail per stud, 3/4 to 1 inch below the top edge and 3/8 inch from the ends, driven flush.
  • Lap each course at least 1-1/4 inches, and treat every butt joint.
  • Keep the clearances to grade, roofs, decks and flashing that the maker requires.
  • Seal cut edges, and paint primed planks on time with a paint the maker allows.