Installing Nail-Down Hardwood Flooring

20 min read Training Guide

Check the jobsite and moisture readings, confirm the subfloor, lay out and rack the boards, and blind-nail solid strip and plank flooring on the right fastener schedule.

Table of contents

A solid hardwood floor is a few hundred boards that will swell and shrink with the seasons for as long as the house stands. Nailing them down is the easy part. The skill is in deciding whether the house and the wood are ready, setting a working line you can trust, and fastening every board so it stays tight. Most hardwood callbacks start with moisture and fastening mistakes made on day one.

The figures here come from the National Wood Flooring Association (NWFA) guidelines. The flooring maker's instructions control the warranty, so read the sheet in the box, and where it differs from NWFA, the maker wins.

What You Will Be Able to Do

  • Decide whether a jobsite is ready to receive wood flooring.
  • Take and compare moisture readings on the subfloor and the flooring.
  • Check that a wood subfloor and the board direction suit solid flooring.
  • Lay out a working line and rack boards with proper end-joint stagger.
  • Blind-nail and face-nail on the NWFA fastener schedule.

Is the Jobsite Ready?

Wood takes on or gives off moisture until it matches the air around it. Wood installed in a house still wet from construction shrinks later and gaps. Dry wood installed in a damp house swells and cups. NWFA lists conditions to meet before the wood is delivered:

  1. The building is fully enclosed, with windows and doors in.
  2. Concrete, masonry, plaster, drywall, texture and primer coats of paint are finished. These release a lot of water.
  3. The permanent heating or air conditioning has run for at least 5 days before installation, where codes allow, holding normal living temperature and humidity. If it cannot run yet, a temporary heating or dehumidifying system that copies normal conditions can let the job go ahead.
  4. Basements and crawlspaces are dry. If a basement needs power washing, do it first and let it dry.
  5. A crawlspace has at least 18 inches from the ground to the underside of the joists, and the ground is fully covered with black polyethylene of at least 6 mil, or another puncture-resistant vapor retarder.

Many makers state an indoor humidity range the house must hold, often around 30 to 50 percent. Record temperature and humidity before and on delivery day.

Reading Moisture

Moisture content (MC) is the weight of water in wood as a percent of the wood's dry weight. Wood settles at an equilibrium moisture content (EMC) that depends on the air's temperature and humidity. The USDA Forest Products Laboratory gives these typical averages for interior wood:

Region Average MC Typical range
Most of the United States 8 percent 6 to 10 percent
Dry Southwest 6 percent 4 to 9 percent
Damp, warm coastal areas 11 percent 8 to 13 percent

Actual houses can differ, which is why you measure.

How Many Readings

NWFA asks for enough readings to get a fair average:

  • Subfloor: at least 20 readings for the first 1,000 square feet, plus 4 more for every 100 square feet after that. Take at least 3 in every room, and check near exterior walls and plumbing.
  • Flooring: at least 40 boards for the first 1,000 square feet, plus 4 more per 100 square feet, pulled from different bundles. With a pin meter, test the back of the board so you do not mark the face.

Set the meter for the species. Record, date and photograph the results. A board that reads far off from the rest stays out of the floor.

Comparing Floor and Subfloor

NWFA's rule of thumb is that the wood subfloor should read no more than 4 points higher than solid strip flooring (boards under 3 inches wide) and no more than 2 points higher than solid plank (3 inches and wider). Wider boards move more, so the limit is tighter.

Worked example. A crew is installing 2-1/4-inch red oak strip. The flooring averages 7 percent and the subfloor averages 10 percent. The difference is 3 points, which is inside the 4-point limit. If the same subfloor were getting 5-inch plank, a 3-point difference is over the 2-point limit. Find out why the subfloor is wet, and wait or dry it out before installing.

Acclimation Is About Moisture, Not Days

Acclimation means bringing the wood to the moisture level it will live at. A number of days on the box is only a guess. NWFA says that when the flooring and subfloor already match the expected living conditions, you may install right away. When they do not, open the packages and cross-stack the boards with 3/4-inch to 1-inch spacers so air reaches every side, and keep measuring until readings settle. Imported and tropical species can take two to three times longer than most domestic woods.

Why a Few Points Matter

NWFA gives each species a dimensional change coefficient, the change in width per inch of board for each 1-point change in moisture content. For red oak it is 0.00369.

Worked example. A 5-inch red oak plank goes from 6 percent to 9 percent, a change of 3 points.

  • 3 x 0.00369 x 5 = 0.055 inch of swelling per board.
  • Across a 10-foot-wide room, that is 120 / 5 = 24 boards, and 24 x 0.055 = about 1.3 inches on paper.

The real figure is lower, since nailed boards hold each other back, but it shows why dry wood installed before a damp season cups or buckles.

The Subfloor and Board Direction

Refasten loose panels, set protruding fasteners, sweep, and check flatness against the maker's tolerance.

Panel Thickness

NWFA ties the minimum single-layer subfloor to joist spacing:

Joist spacing NWFA minimum panel
16 inches on center or less 5/8-inch (19/32) plywood or 23/32-inch OSB, Exposure 1
Over 16 up to 19.2 inches 3/4-inch (23/32) panel
Over 19.2 up to 24 inches A thicker panel, such as 7/8 inch, or two layers

A panel that meets the building code at 24 inches can still be too springy for wood flooring, so check the current NWFA guidelines and the flooring maker at that spacing.

Direction

Over a single layer of subfloor, run solid strip and plank perpendicular to the joists, or on a diagonal. When the design calls for boards parallel to the joists, NWFA gives two choices: add a layer of at least 15/32-inch plywood underlayment over the subfloor, or brace between the joists as the joist maker and the code allow. Some engineered joist systems cannot be braced this way, so ask before cutting anything into them.

Grade and Concrete

Solid flooring can go above grade or on grade, but not below grade. NWFA counts a floor as below grade when soil sits more than 3 inches above the finished floor level along any outside wall.

Over a slab, solid flooring needs a wood subfloor built on the concrete, with a vapor retarder such as 6-mil polyethylene under it, unless the maker allows gluing direct.

Vapor Retarder Over Wood

Lay an approved vapor retarder over a wood subfloor before the flooring. Common choices are asphalt-saturated kraft paper or #15 or #30 felt meeting ASTM D4869 or federal spec UU-B-790 Grade D. Overlap seams at least 4 inches, run it fully to the walls, and fasten it down so it does not wrinkle under the boards.

Laying Out

  1. Mark the joists. Snap or pencil the joist locations on the walls. Your face-nailed first and last rows should land in joists, and wide plank needs to hit them too.
  2. Pick the starting wall. It is usually the longest unbroken wall, but think about what people see: a fireplace, the main entry, cabinet runs and transitions to other rooms.
  3. Snap a working line. Set it the width of a board plus the expansion space away from the starting wall. Measure at both ends so the line is straight even if the wall is not.
  4. Choose wall-line or center-line layout. In a large or out-of-square room, you can snap a center line instead, screw a straight starter board along it, and work out toward one wall. Then remove the starter, glue and nail a spline (a loose tongue) into the exposed groove, and work toward the other wall.

Expansion Space

Leave expansion space around the whole perimeter and at every vertical obstruction, such as pipes, columns and hearths. NWFA's common rule is a gap equal to the thickness of the flooring, unless the maker says otherwise. Base and shoe molding cover it.

On floors wider than about 20 feet, NWFA notes that you may need a little extra space between rows, depending on the region, the climate control and the season. Crews use a washer or removable spacer every few rows, or start in the center and work both ways. Do not use anything that marks a prefinished edge.

Racking the Boards

Racking means laying boards out loose, several rows ahead, so you can plan end joints, lengths and color before you nail.

  • Pull from several bundles at once to mix color and length.
  • Spread short pieces through the floor. Do not cluster them in one area.
  • Avoid H joints, where end joints in two rows line up with one row between them.
  • Stagger end joints at least 6 inches row to row for strip flooring, and 8 to 10 inches for 3-inch to 5-inch plank. On plank wider than 5 inches, stagger as much as the lengths allow.

Fastening

The Schedule

These are NWFA's general figures for 3/4-inch solid tongue-and-groove flooring. Thinner flooring takes shorter fasteners, and the maker's schedule wins.

Flooring Fastener Blind spacing End rule
Solid strip, under 3 inches 1-1/2 to 2-inch cleat or staple 8 to 10 inches At least 2 per board, 1 to 3 inches from each end
Solid plank, 3 inches and wider 1-1/2 to 2-inch cleat or staple Tighter, often 6 to 8 inches Same
Face nailing 6d to 8d casing or finish nail 10 to 12 inches Pre-drill near ends

On wide plank, NWFA also allows screwing and plugging the board ends, or adding a flooring adhesive the maker approves, to help hold the board flat.

Setting the First Rows

  1. Lay the first row with its tongue facing into the room and its edge on the working line.
  2. Pre-drill and face-nail the edge nearest the wall, close enough that the base will cover it, into the joists where you can. Dense species split without pilot holes.
  3. Blind-nail through the tongue of the same row by hand, or with a nailer once there is room.
  4. Hand blind-nail the next row or two until the flooring nailer fits.

Running the Field

  1. Tap each board tight to the last row. Strike the tongue side with a block, never the groove, which crushes. Do not hit a prefinished face with a mallet.
  2. Fit the nailer with the adapter plate for your flooring thickness. A wrong plate dents the edge or drives the fastener at the wrong angle.
  3. Test on scrap and adjust the air pressure. The fastener head should sit flush in the tongue pocket. A proud head stops the next board from seating, and an overdriven one splits the tongue.
  4. Nail the board ends first, within 1 to 3 inches of each end, then fill in at the schedule spacing.

Keep your free hand and feet clear of the nailer's shoe, strike the plunger squarely, wear eye and hearing protection, and disconnect the air before clearing a jam.

Finishing Rows

  1. Near the far wall, switch back to hand blind-nailing when the nailer will not fit, then to face nailing.
  2. Rip the last row to leave the expansion space, pull it tight with a pull bar, and face-nail it into the joists where you can.

After the Floor Is Down

Unfinished solid flooring should settle into its conditions before sanding and finishing. NWFA suggests 5 to 7 days when the schedule allows, with the heating or air conditioning running at living conditions.

Common Mistakes

Mistake What it costs
Installing before drywall and paint have dried Gaps when the house dries out
Skipping moisture readings Cupping, buckling and no record to defend the job
Running boards parallel to joists with no extra layer Sagging, squeaks and open seams between joists
Fasteners too far apart or missing at the ends Loose ends, squeaks and lifted boards
No row spacing on a wide floor in a dry season A floor that buckles the next summer

Check Your Understanding

1. The drywall crew finished taping yesterday, and the furnace has not been turned on. The flooring is in the truck. Do you unload it?

No. Wet trades must be done and the heating or air conditioning should run at living conditions for at least 5 days first. Keep the wood out until then.

2. You are installing 6-inch white oak plank. The flooring averages 7.5 percent and the subfloor averages 10 percent. Can you start?

No. The difference is 2.5 points, and plank 3 inches and wider allows no more than 2. Find why the subfloor is wet and let it come down first.

3. The customer wants strip flooring to run the same direction as the joists, over a single layer of 3/4-inch plywood. What do you do?

Add a layer of at least 15/32-inch plywood underlayment, or have the joists braced where the joist maker allows. Without one of those, the floor can sag and gap between joists.

4. A helper is blind-nailing strip flooring every 14 inches and skipping the ends of short boards. What do you tell them?

Strip needs fasteners every 8 to 10 inches, and at least two per board, each 1 to 3 inches from the ends. Loose ends squeak and lift.

Key Takeaways

  • The house must be closed, dry and running at living conditions for at least 5 days before wood arrives.
  • Acclimation is a moisture target, not a number of days. Measure the floor and subfloor.
  • Keep the subfloor within 4 points of strip and 2 points of plank.
  • Run boards across the joists, or add plywood or bracing when they run parallel.
  • Stagger end joints at least 6 inches for strip and 8 to 10 inches for 3 to 5-inch plank.
  • Blind-nail strip every 8 to 10 inches with at least two fasteners per board near the ends.