Set the ceiling height, lay out balanced borders, hang and level main runners, install cross tees and wall molding, and cut and set tile around lights and other trades.

Table of contents

The ceiling in most offices, schools, clinics and stores is a grid of thin metal runners hung on wires, filled with lay-in tiles. It hides ducts, pipes and wiring while leaving them reachable, it quiets the room, and it is where lights, sprinklers and diffusers land. A good ceiling is level, square to the room, and has even border tiles on both sides. A bad one sags, has a sliver of tile along one wall, and has wires pulled sideways around ducts.

This guide covers standard exposed-grid ceilings with lay-in tile. Grid members are rated under ASTM C635 and installed under ASTM C636, and the grid and tile makers publish their own instructions. The reflected ceiling plan in the drawings shows the grid layout, heights and devices, and in earthquake zones and fire-rated ceilings, the codes and listings add requirements that the drawings will spell out.

What You Will Be Able to Do

  • Read a reflected ceiling plan and set the ceiling height.
  • Lay out the grid so border tiles are balanced and at least half a tile wide.
  • Hang wire at the right spacing and tie it off correctly.
  • Install wall molding, main runners and cross tees level and square.
  • Cut tile and work around lights, sprinklers and other trades.

Parts of the System

Part What it does
Wall molding (wall angle) L-shaped trim on the walls that holds the edges of the grid
Main runner (main tee) Long members, usually 12 feet, hung from wires, that carry the ceiling
Cross tee 4-foot and 2-foot members that lock into the mains to form the grid
Hanger wire Wire from the structure above that holds up the mains
Lay-in tile Panels that drop into the grid

Duty ratings. ASTM C635 rates mains as light, intermediate or heavy duty by how much load they carry per foot over a 4-foot span. One maker lists intermediate duty at 12 pounds per foot and heavy duty at 16 pounds per foot. Use the duty the spec calls for, which depends on what will sit in the ceiling.

Tile edges. Square-edge tile sits flush in the grid. Tegular tile has a stepped edge that drops below the grid face. Tegular cuts need an extra step, covered below.

Before You Start

  1. Read the reflected ceiling plan. It shows the ceiling as if you were looking down at a mirror on the floor: grid size, starting points, height, and the location of lights, diffusers, sprinklers, speakers and access panels.
  2. Check what is above. Ducts, pipes, cable trays and beams can block wires. Find conflicts now and talk to your lead about how to hang around them.
  3. Check clearance. The space between the grid and the lowest thing above must be enough to tilt tiles and fixtures in. Check the tile and fixture makers' minimums.
  4. Wait for the right time. Most tile makers call for the building to be closed in, with wet work like concrete and plaster dry, and the HVAC running, before tile goes in. Damp air makes some tiles sag.

Set the Height

  1. Mark the ceiling height from the drawings at one point in the room.
  2. Use a rotary or line laser to transfer that height around every wall. Measuring up from the floor at each point copies every dip in the floor into the ceiling.
  3. Snap or mark a line at the height of the bottom of the wall molding.

Lay Out the Grid

The goal is a grid centered in the room, with border tiles on opposite walls the same width and at least half a tile wide. A thin strip of tile at one wall looks wrong, cuts poorly and falls out.

Worked Example: Balancing the Borders

A room measures 164 by 256 inches. The grid is 24 by 24 inches.

The short direction, 164 inches:

  • 164 / 24 = 6 full tiles, with 164 - 144 = 20 inches left over.
  • Split it: 20 / 2 = 10-inch borders. That is less than half a tile (12 inches).
  • Use one fewer full tile: 5 x 24 = 120 inches, leaving 44 inches. 44 / 2 = 22-inch borders.

The long direction, 256 inches:

  • 256 / 24 = 10 full tiles, with 256 - 240 = 16 inches left over, so 8-inch borders. Too small.
  • Use 9 full tiles: 216 inches, leaving 40 inches. 40 / 2 = 20-inch borders.

So the first main runner goes 22 inches from one long wall, and the first cross tee line goes 20 inches from one short wall. Some drawings set the grid on a different line, such as centered on a light or a doorway. The drawings win.

String Lines

Pull two tight string lines across the room at the height of the bottom of the grid: one where the first main runner goes, and one at right angles where the first cross tee line goes. Check that they are square with a 3-4-5 triangle, or 6-8-10 for a larger room. Every other runner is measured from these lines.

Install Wall Molding

  1. Fasten the wall molding with its bottom at the height line, using fasteners suited to the wall: screws into studs, or anchors into masonry.
  2. Space fasteners as the maker calls for. One maker calls for no more than 24 inches apart.
  3. At inside corners, lap one piece over the other or miter them. At outside corners, miter them.
  4. Keep the molding straight. Wavy walls make wavy molding, so shim or scribe where the wall bows.

Hang the Wire

ASTM C636 sets the basic rules. One ceiling maker's summary of the standard gives these numbers for a standard grid:

Item Rule
Wire size 12-gauge galvanized at minimum
Main runner spacing 4 feet on center
Wire spacing along each main 4 feet on center
Wire capacity At least 5 times the load it carries

Worked example. With mains 4 feet apart and wires 4 feet apart, each wire holds a 4 x 4 = 16 square foot area. At a ceiling weight of 4 pounds per square foot, that is 16 x 4 = 64 pounds. The wire must hold at least 5 x 64 = 320 pounds. Heavier tiles, lights or other loads mean more wires or closer spacing, as the drawings show.

Attaching to the structure. Use anchors approved for the structure: screw eyes into wood, powder-actuated or drilled anchors into concrete, clips on steel. Never tie a wire to a duct, pipe, conduit, sprinkler line or another trade's hanger. Those were not designed to hold the ceiling.

Tying off. Wrap the wire around itself at least three full turns. One grid maker's instructions call for the three turns to be within 3 inches. A loose wrap slips over time.

Keep wires plumb. A wire that hangs at an angle pulls the main sideways. Where a duct is in the way, ask your lead about a trapeze, a short piece of channel hung from wires on each side of the obstruction, with the ceiling wires hung from it. Wires that must be splayed need bracing or a counter-splayed wire as the spec shows.

Bend the wire. Put a bend in each wire at the ceiling height, using the string line, so the main can be hung and leveled fast.

Warning: Hanger wire ends poke at eye level. Wear safety glasses with side shields, and bend back or trim the free ends. Work from a scissor lift, rolling scaffold or ladder that reaches without overreaching, and never stand on the top cap of a stepladder.

Install Main Runners

  1. Cut the first main. Measure from the wall to where the first cross tee slot must fall, so the slots line up with your cross tee layout line. Cut the main at the wall end so it rests on the wall molding.
  2. Hang it. Thread the wires through the holes in the main and twist them up to the ceiling height.
  3. Splice the next main. Mains lock end to end with their built-in splices. Make sure each splice is fully engaged.
  4. Level as you go. Sight down the main or check it against the string line or laser, and adjust the wires. A sag between wires means a wire is missed or loose.
  5. Repeat at 4 feet on center, lining up the cross tee slots on every main with the same layout line.

Install Cross Tees

  1. Snap the 4-foot cross tees into the main runner slots, at the spacing for your tile size.
  2. For a 2 by 2 grid, add 2-foot cross tees between the 4-foot tees.
  3. At the walls, cut the border tees to length and rest them on the wall molding.
  4. Check square. Measure the diagonals of a few grid openings. In a square grid, the two diagonals match. If they do not, the mains have shifted along their length. Fix it now. Every tile after this depends on it.

Some makers offer clips or stabilizer bars to keep border tees from spreading or pulling out of the wall molding. Use them where the maker or spec calls for them, especially in earthquake zones.

Lights, Diffusers and Other Devices

  • Lights. Lay-in fixtures sit in the grid. The electrician makes all electrical connections and fastens each fixture to the grid as the electrical code requires. Many specs and grid makers also call for extra hanger wires from the fixture corners to the structure, so the fixture's weight does not land only on the grid.
  • Sprinkler heads. The sprinkler fitter sets the heads. Cut tile so the head and its trim ring fit as designed. Do not move or touch sprinkler heads.
  • Diffusers and grilles. These usually sit in the grid and may need their own wires. Follow the HVAC drawings.
  • Wiring. Electrical cable and conduit must have their own supports. They may not ride on ceiling wires unless the electrical code allows it, and the grid is not a cable tray.

Cutting and Setting Tile

  • Handle tile carefully. Wear clean gloves, because fingerprints on tile faces do not come off. Some tile is fiberglass, which irritates skin.
  • Cut face up with a sharp utility knife and a straightedge. Change blades often. A dull blade tears the face.
  • Border tiles. Measure each border opening, since walls are not straight, and cut the tile about 1/8 inch smaller than the opening so it drops in without forcing.
  • Tegular edges. A cut tegular tile has a square edge where it was cut. Recut a step into it, using a tegular cutting tool or by scoring the face and cutting the back, so it sits at the same depth as the factory edges.
  • Around pipes and heads. Cut a hole slightly larger than the item, and split the tile from the nearest edge if needed, then fit it in place.
  • Setting. Tilt the tile up through the grid opening, then lower it flat onto the flanges. Do not push up on tiles that are already in.

Fire-Rated and Earthquake Ceilings

A fire-rated ceiling is part of a tested assembly. It needs the listed grid, listed tile, the hold-down clips that keep tiles in place in a fire, and fixture protection as the listing requires. In areas with earthquake design requirements, codes add bracing, wider wall moldings, perimeter details and other rules. In both cases, the drawings and the listing control, and substitutes are not allowed without approval.

Common Mistakes

Mistake What it costs
Heights measured up from the floor A ceiling that follows every dip in the slab
No border layout A sliver of tile at one wall
Wire tied to a duct or pipe A ceiling that sags or drops when the pipe moves
Loose or short wire wraps Wires that slip and mains that sag
Out-of-square grid Tiles that will not drop in and gaps at edges
Tiles installed in a damp building Tiles that sag and stain
Touching tile faces with bare hands Fingerprints on a new ceiling

Check Your Understanding

1. A room is 140 inches wide with a 24-inch grid. Where does the first main go?

140 / 24 = 5 full tiles with 20 inches left, or 10-inch borders, which are less than half a tile. Use 4 full tiles: 96 inches, leaving 44, so 22-inch borders. The first main goes 22 inches from the wall.

2. A duct runs right where three hanger wires should go. A coworker suggests tying them to the duct's hangers. What do you say?

No. Ceiling wires go to the structure. Ask your lead about a trapeze over the duct.

3. You measured the diagonals of a grid opening and got 33-3/4 inches and 34-1/4 inches. What does that tell you?

The grid is out of square. Adjust the mains or cross tees until the diagonals match before you set tile.

4. You cut a tegular border tile and it sits higher than the tiles next to it. What did you miss?

The cut edge must be recut with a step to match the factory tegular edge.

Key Takeaways

  • Set the height with a laser from one reference, not up from the floor.
  • Balance the borders so opposite walls match and each border is at least half a tile.
  • Use 12-gauge wire at 4 feet along mains 4 feet apart, tied to the structure with at least three tight turns.
  • Never hang the ceiling from ducts, pipes or conduit.
  • Check the grid for square before setting tile.
  • Lights, sprinklers and wiring belong to their trades. Leave their work to them.