Install vinyl starter strip, corner posts, J-channel and panels with loose nailing, correct gaps and overlaps, so the siding moves with the weather without buckling or blowing off.

Table of contents

Vinyl siding is light, fast to hang and easy to cut, which makes it look simple. It is not forgiving of one thing: being held tight. Vinyl grows and shrinks a lot with temperature, and every panel has to slide freely on its nails all its life. Nearly every wavy, buckled or blown-off vinyl wall comes from panels nailed tight, cut too long, or pulled up too hard.

The numbers in this guide come from the Vinyl Siding Institute (VSI) installation manual, which follows ASTM D4756, the standard practice for installing vinyl siding and soffit. The panel maker's instructions control the warranty and can differ, so read them for the product on the truck. Local code wins where it is stricter.

What You Will Be Able to Do

  • Explain how vinyl moves and why it is hung loose.
  • Fasten panels and accessories with the right nail, spacing and clearance.
  • Install starter strip, corner posts and J-channel in the right order.
  • Hang, lap, cut and finish panels around windows, under eaves and at gables.
  • Find the cause of waves, gaps and loose panels.

How Vinyl Moves

The VSI manual says vinyl can expand and contract 1/2 inch or more over a 12-foot-6-inch length with normal seasonal temperature changes. A panel cut to fit snug on a cold morning will push against its channels by afternoon. With nowhere to go, it bows out in a wave.

Two habits handle that movement:

  • Gaps at the ends. Every panel end sits a little short of the corner post or channel it slides into.
  • Loose nails. Nails go in the center of each slot and stop short of the vinyl, so the panel hangs on them and slides.

Before You Start

  • Check the wall. Vinyl must go over sheathing, not bare studs. The WRB and all flashing must be complete. The wall must be flat, since vinyl telegraphs every bump.
  • Store it right. Keep cartons flat and fully supported, no more than six boxes high, and out of places hotter than 130°F, such as hot blacktop or under a dark tarp.
  • Tools: tin snips, utility knife, fine-tooth circular saw blade mounted backward or a blade made for vinyl, snap lock punch, nail slot punch, unlocking (zip) tool, level, chalk line and safety glasses.
  • Cold weather: vinyl gets stiffer and more brittle as it gets colder. Cut slowly, handle panels gently, and use the larger cold-weather gap described below.
  • Old siding: do not side over asbestos cement siding without first checking with the environmental agency or building official, per the VSI manual. Old painted siding on a pre-1978 home may also carry lead rules.

Fastening Rules

Item Rule
Nail type Aluminum, galvanized steel or other corrosion-resistant
Nail size Head at least 5/16 inch, shank 1/8 inch
Penetration At least 1-1/4 inches into nailable material, sheathing plus framing
Placement Center of the slot, straight and level
Clearance About 1/32 inch between head and vinyl, the thickness of a dime
Horizontal panels Every 16 inches at most
Vertical panels Every 12 inches
Accessories Every 8 to 12 inches
  • Foam does not count. Foam sheathing adds no holding power, so use nails long enough to reach 1-1/4 inches into wood behind it.
  • Start in the middle. Nail from the center of a panel out toward the ends.
  • No face nails. Never nail or staple through the face of a panel. The one exception is the last small piece at the top of a gable, which gets a painted aluminum or stainless trim nail.
  • Off a stud? If a slot does not land over something nailable, extend it with a nail slot punch. Do not nail at a slant to reach.

Test each panel after nailing. It should slide side to side by hand. If it will not, the nails are too tight.

Order of Work

  1. Soffit receiving channel, or corner posts, depending on the job and the soffit method.
  2. Starter strip.
  3. Corner posts.
  4. J-channel around windows and doors.
  5. Siding panels, bottom to top.
  6. Utility trim and the last course under the eaves.
  7. Gable J-channel and gable panels.

Starter Strip

  1. Snap a level line 1/4 inch less than the starter strip's width above the lowest point of the wall.
  2. Nail the strip with its top edge on the line, every 10 inches, in the center of the slots.
  3. Gap the ends. Leave at least 1/4 inch between pieces and room at corners for the corner posts.
  4. Fur it out if needed. If insulation or backer board makes the wall thicker, fur the strip out so the first course sits at the right angle.

Corner Posts

  1. Flash the corner first. Inside and outside corners get flashing at least 10 inches onto each wall before the post goes on.
  2. Set the height. Leave a 1/4-inch gap between the top of the post and the eave or soffit. Let the bottom run 3/4 inch below the starter strip.
  3. Hang it from the top. Drive the first nail on each side at the top of the uppermost slot, so the post hangs from it. Every other nail goes in the center of its slot, every 8 to 12 inches.
  4. Plumb it. Check both faces. A post out of plumb throws every course off.
  5. Splice long posts by overlapping the upper piece 3/4 inch over the lower one and leaving 1/4 inch for expansion.

J-Channel at Windows and Doors

J-channel is a trim piece with a pocket that receives the cut ends of panels. Around an opening it must shed water out over the siding, never into the wall.

  1. Head flashing first. Make sure the window's head flashing or drip cap is in, lapped correctly into the WRB.
  2. Bottom piece if the window needs one, cut to extend past both sides.
  3. Side pieces: cut them longer than the window height and notch the top so the head piece can lap over them.
  4. Top piece: cut a 45-degree miter on the face and bend the tab down into the side J-channels, so water at the head flows over the side pieces and out.
  5. Nail every 8 to 12 inches, centered in the slots, without nailing tight.

Where J-channel runs along a roof line, keep it at least 1/2 inch above the roofing, and place the nail nearest the roof at the far end of its slot. Where a roof's eave meets a wall, a kickout flashing or diverter must send water into the gutter and away from the siding.

Hanging Panels

  1. First course: lock the panel into the starter strip along its full length. Check that the lock is engaged everywhere, then nail.
  2. Leave end gaps. Leave 1/4 inch between the panel end and each corner post or J-channel. Increase it to 3/8 inch when installing below 40°F, because the panel will grow when it warms up.
  3. Overlap panels about 1 inch, which is half the factory notch.
  4. Hide the laps. Overlap panels away from entrances and from where people look most, so the laps face away from the viewer.
  5. Avoid short pieces. Do not use pieces shorter than 24 inches.
  6. Stagger seams. Keep laps at least 2 feet apart from one course to the next, and at least three courses apart before two line up.
  7. Lock, do not pull. Push each panel up until its lock engages, and nail it. Do not stretch it upward before nailing. A panel under tension pulls out of its lock or leaves gaps.
  8. Check level every fifth or sixth course, and check against the adjoining walls.

Warning: Wear safety glasses when cutting. Snipped vinyl edges and saw chips fly, and cold vinyl can shatter.

Worked Example: Cutting to Length

A wall runs 11 feet 4 inches between the inside faces of two corner post pockets. It is 35°F outside.

  • In cold weather, leave 3/8 inch at each end.
  • 11 feet 4 inches is 136 inches. 136 minus 3/8 minus 3/8 equals 135-1/4 inches.
  • Cut the panel 135-1/4 inches long, or 11 feet 3-1/4 inches.

Cut it to 136 inches to fit tight, and on the first warm afternoon that panel will need about another 1/2 inch of room it does not have.

Around Windows

  1. Mark the width. Hold the panel under the window and mark the width of the opening, adding about 1/4 inch on each side.
  2. Mark the height. Lock a scrap piece into the course below, slide it up to the sill, and mark 1/4 inch below the sill. Transfer that to the panel.
  3. Cut the vertical lines with snips and score the horizontal line with a utility knife, then snap it out.
  4. Punch the edge. Run a snap lock punch along the cut edge every 6 inches, with the raised lugs facing out.
  5. Lock it in. Install utility trim under the sill. The punched lugs lock into it so the cut panel cannot work loose.

Last Course Under the Eaves

  1. Measure from the soffit down to the base of the upper lock on the last course, and subtract 1/4 inch.
  2. Mark that dimension on a panel, measured from its bottom edge, at several points along the wall, since soffits are not always straight.
  3. Cut, then punch the cut edge every 6 inches.
  4. Nail utility trim along the top of the wall, and push the panel up into it until the lugs lock.

Install any soffit accessories before this last course goes on.

Gables

  1. J-channel along the rakes, nailed every 8 to 12 inches, with a 3/4-inch overlap where pieces join. At the peak, one side butts into the peak and the other overlaps it with its face mitered.
  2. Make a template. Lock a short scrap into the course, hold another piece against the rake J-channel, and trace the slope. Cut it and use it to mark each panel. Check it every few courses.
  3. Top piece: the last small piece at the peak is the one place a face nail is allowed. Use a painted aluminum or stainless trim nail 1-1/4 to 1-1/2 inches long.

Fixtures and Shutters

  • Lights, outlets, vents and hose bibs go on mounting blocks. Cut the opening in the panel 1/4 inch larger than the block or trim ring, so the panel can still move.
  • Shutters and other screwed-on items: drill each hole in the vinyl at least 1/4 inch larger than the screw.

Do Not Caulk

Do not caulk panels where they meet corner posts, J-channels or other receivers, and do not caulk overlaps. Caulk glues the panel in place, and the pockets need to drain.

Fixing Problems

Problem Likely cause Fix
Waves or bulges in a wall Nailed tight, or ends cut too long Pull nails, re-nail with clearance, trim ends
Gaps at J-channel in winter Panels cut too short or with no overlap planned Replace short panels
Panels unlock or blow off Not fully locked, nails too far apart Re-lock and nail at 16 inches or less
Panel stuck, will not slide Nail driven against the hem Back the nail out to a dime's clearance
Courses out of level at a corner Starter not level, or no checks Fix the line before going higher
Cracked panel Impact, or cutting cold vinyl fast Replace the panel

Training and Certification

VSI runs a certified installer program based on ASTM D4756. Reading this guide is not certification, and much of the skill comes from hanging panels next to someone who has done it for years.

Check Your Understanding

1. A coworker drives every nail tight so the siding "won't rattle." What will happen, and what do you tell him?

The panels cannot slide, so they buckle and wave when they warm up. Leave about 1/32 inch, a dime's thickness, between the nail head and the vinyl.

2. It is 30°F, and a wall measures 9 feet 10 inches between the receiving pockets. How long do you cut the panel?

Leave 3/8 inch at each end because it is under 40°F. 118 inches minus 3/4 inch equals 117-1/4 inches, or 9 feet 9-1/4 inches.

3. You see a corner post nailed through the bottom of every slot. Why is that a problem?

A vertical piece must hang from a nail at the top of its top slot, with the rest centered. Nailed at the bottom of the slots, it cannot move and can buckle.

4. A homeowner asks you to caulk where the panels meet the window J-channel to "seal it up." What do you say?

Caulk would glue the panels in place and block drainage. The J-channel pocket is meant to hide the gap and let water out, and the WRB and flashing behind it keep the wall dry.

Key Takeaways

  • Vinyl moves 1/2 inch or more over a 12-foot-6-inch length, so it must hang loose.
  • Nail in the center of the slot, about a dime's thickness short of tight, 16 inches apart at most.
  • Gap panel ends 1/4 inch, or 3/8 inch below 40°F, and overlap panels about 1 inch.
  • Hang corner posts from the top slot, and lap window head J-channel over the sides.
  • Lock each course without pulling it up, stagger seams, and check level every few courses.
  • Never face nail, except the top gable piece, and never caulk vinyl into its trim.