Laying Out a Cabinet Installation

20 min read Training Guide

Find the high point of the floor, snap level lines for base and wall cabinets, mark studs, and check every appliance opening before the first cabinet goes up.

Table of contents

Cabinets show every mistake in the room. A floor that dips, a wall that bows or a corner that is not square will turn into crooked doors, gaps at the backsplash and a countertop that will not sit flat. Layout is the hour you spend with a level, a tape and a pencil before you lift anything. It is where you find those problems while they are still cheap to fix.

This guide covers kitchen and bath cabinets built as boxes, either face-frame or frameless, set on a floor and hung on wood or steel studs. The cabinet maker's installation instructions and the appliance spec sheets control the exact numbers. The numbers below are common standards to check against.

What You Will Be Able to Do

  • Find the high point of the floor along every cabinet run.
  • Snap level lines for the tops of base cabinets and the bottoms of wall cabinets.
  • Check walls for plumb, flatness and square corners, and decide what to do about each problem.
  • Mark studs and draw the cabinet layout on the wall.
  • Check appliance, sink and window openings against the actual cabinets and spec sheets.

Before You Start

  1. Open and inspect every box. Check the cabinet list against the drawing, look for shipping damage, and report problems before install day, not halfway through it.
  2. Take off doors, drawers and shelves. Label each one with the cabinet it came from, using painter's tape on the back. The boxes are lighter and the parts stay clean.
  3. Stage the cabinets in another room in the order you will install them.
  4. Shut off what feeds the old kitchen. Water to the sink and dishwasher, and the breakers or gas to appliances. Moving gas pipes, drains, supply lines or outlets is work for the licensed plumber, gas fitter or electrician, and it should be done before cabinets go in.
  5. Prime and paint the walls if they will be painted, and install the finish floor first if the plan puts cabinets on top of it. Painting behind cabinets now saves cutting in around them later.

Tools

Tool What it does
Laser level or 4-foot and 6-foot levels Finds the high point and sets level lines
Long straightedge Shows humps and hollows in walls
Stud finder and a thin nail Finds framing, and confirms it
Framing square and tape Checks corners and measures runs
Chalk line and pencil Marks lines you can see from a ladder

Find the High Point of the Floor

Floors are rarely level. Base cabinets must be level along their tops, so every cabinet gets shimmed up to match the highest spot in its run. If you start from a low spot, the cabinet sitting on the high spot ends up taller than your line, and you cannot shim it down.

  1. Set a laser level so its line hits the wall a few feet above the floor, or set a long level on a straight board.
  2. Measure from the floor up to the laser line at every point the cabinets will sit, including the front edge, the back and across appliance openings. Check every 2 feet or so.
  3. The shortest measurement is the high point, because the floor is closest to the line there.
  4. Repeat for every separate run, including an island.

Worked Example: Finding the High Point

You measure from the floor to a laser line at six spots along a 12-foot wall: 41-3/8, 41-1/4, 41-1/8, 41-1/4, 41-1/2 and 41-5/8 inches.

  • The high point is where you read 41-1/8 inches.
  • The lowest spot reads 41-5/8 inches, which is 1/2 inch lower than the high point.
  • That cabinet will need about 1/2 inch of shims to come up to the line.

If one run needs more than about 3/4 inch of shim, tell your lead before you start. The countertop, the dishwasher height and the toe kick all depend on it, and big shims may need a different fix, such as a separate base frame.

Remember the finish floor. If tile or wood goes in after the cabinets, add its thickness to every line, or the dishwasher may not fit under the counter.

Snap the Level Lines

Measure up from the high point and draw a level line along every wall that gets cabinets. Common heights from one maker's instructions are below. Check yours.

Line Height from the high point What it marks
Base line 34-1/2 inches Top of standard base cabinets
Wall cabinet bottom line 54 inches 19-1/2 inches above the base line
Top of 30-inch wall cabinets 84 inches Also the usual soffit or crown check
Top of 36-inch wall cabinets 90 inches
Top of 42-inch wall cabinets 96 inches

A 34-1/2-inch cabinet plus a 1-1/2-inch top gives a 36-inch counter, which is the usual kitchen height. The 18 inches between the counter and the bottom of the wall cabinets is the usual clearance for backsplashes and small appliances.

These lines are reference marks for height. They do not replace checking each cabinet with a level as you set it.

Warning: Before you cut, drill or drive a screw into a wall, check what is inside it. Look for outlets, switches and pipes above or below the spot, and use a stud finder that detects wiring. Wires and pipes often run horizontally through the area where wall cabinet screws go.

Check the Walls

Plumb

Hold a 4-foot level on the wall at each end of a run and in the middle. A wall that leans in or out at the top changes how the wall cabinets hang and how the end panels meet the wall. Write down how far out each spot is.

Flatness

Hold a long straightedge flat on the wall at the base line and at the wall cabinet lines. Look for light behind it.

What you find What it does Fix
Hollow (dip) Pulling a cabinet into it bows the box and racks the doors Shim behind the cabinet at the studs
Hump A cabinet rocks on it and stands off the wall at the ends Shave a drywall joint hump with a rasp or knife, or shim around it
Big bow, over about 1/4 inch Shims alone will show as gaps at the top Talk to your lead. The wall may need work first

Square Corners

Check each inside corner with a framing square, or with the 3-4-5 method: mark 3 feet out on one wall and 4 feet out on the other, measured from the corner at the same height. The diagonal between the marks should be exactly 5 feet. Use 6-8-10 for a bigger check.

An out-of-square corner does not stop you from setting cabinets, but it changes where the gaps end up. The countertop has to be cut to the real angle, and the filler or end panel at the far end of the run gets scribed to make up the difference.

Mark the Studs

  1. Find each stud with a stud finder, and confirm it with a thin nail or small bit driven where the cabinet will cover the hole.
  2. Mark the center of each stud with a vertical line that runs from below the base line to above the top of the wall cabinets.
  3. Studs are usually 16 inches on center, but not always. Doubled studs at windows and corners are common, and so are missing ones.

Cabinets hang on screws into framing, never on drywall alone. One maker's instructions call for at least one stud behind every cabinet in the middle of a run and at least two behind a cabinet at the end of a run. If a cabinet lands where there is no stud, stop and plan blocking or a different fastening method with your lead.

On steel studs, use the screws and method the cabinet maker allows for steel framing.

Draw the Layout on the Wall

Transfer the plan to the wall, full size.

  1. Pick the starting point the plan uses, usually an inside corner.
  2. Mark the edge of every cabinet along the base line and the wall cabinet line, using the actual width of each box. Measure the cabinets themselves, not just the numbers on the plan.
  3. Mark every filler strip. A filler is a strip of matching material between a cabinet and a wall or between two cabinets, so doors and drawers can open past a corner or a wall that is not straight.
  4. Mark the centerline of the sink and check it against the drain and the window.
  5. Mark the openings for the dishwasher, range, refrigerator and any built-in appliance.

Worked Example: Checking a Run

The plan for a 144-inch wall shows, from the left corner: a 3-inch filler, a 36-inch sink base, a 24-inch dishwasher opening, an 18-inch drawer base, a 30-inch range opening, a 30-inch base and a 3-inch filler.

3 + 36 + 24 + 18 + 30 + 30 + 3 = 144 inches. It fits on paper.

You measure the wall at the base line and get 143-5/8 inches. The run is 3/8 inch too long. The fix is in the fillers: scribe the right-hand filler down to about 2-5/8 inches. Never steal space from an appliance opening.

Appliance and Fixture Openings

Appliance openings are where layouts fail most, because an appliance either fits or it does not.

  • Get the spec sheet for every appliance before install day, and lay out from its "cutout" or "opening" dimensions, not from its nominal size.
  • Dishwashers commonly need a 24-inch-wide opening and enough height under the counter, measured from the finish floor. Leave room for the water line, drain hose and power to pass from the sink base.
  • Ranges commonly need a 30-inch opening, and slide-in ranges have their own countertop and side panel rules.
  • Refrigerators need width, height and depth, plus the air gap and door swing clearance the maker lists.
  • Above a cooktop, the International Residential Code calls for at least 30 inches of vertical clearance to unprotected combustible material such as a wood cabinet, unless a listed range hood or appliance allows less. The hood or microwave instructions set the actual height. Mark it now, so the wall cabinet over the range is the right height.
  • Sinks need the base cabinet the sink maker calls for, and the faucet must clear the window sill and any wall cabinets.
  • Windows and doors. Check that wall cabinets clear the window casing, and that cabinet doors near a room door can open.

Common Mistakes

Mistake What it costs
Starting from a low spot on the floor Cabinets on the high spot sit above the line, and the whole run is reset
Forgetting the finish floor thickness Dishwasher will not fit under the counter
Laying out from the plan, not the boxes A run that ends 1/2 inch long against a wall
No stud under a cabinet A wall cabinet held only by drywall can fall
Cutting an appliance opening short A new appliance that does not fit
Not checking for wires and pipes A screw through a cable or supply line inside the wall

Check Your Understanding

1. You read 40-3/4, 40-1/2 and 40-7/8 inches from the floor to a laser line. Which reading is the high point, and why?

40-1/2 inches. It is the shortest distance to the line, so the floor is highest there.

2. The tile floor goes in after the cabinets and is 1/2 inch thick with its mortar. Where do you draw the base line?

At 34-1/2 plus 1/2 inch, or 35 inches above the high point of the current subfloor, so the cabinets end up at the right height above the finished tile.

3. A wall cabinet at the end of a run lands over only one stud. What do you do?

Stop and plan the fix with your lead. One maker calls for two studs behind an end cabinet. Add blocking or use the fastening method the maker allows. Do not rely on drywall anchors.

4. The 3-4-5 check on a corner gives a diagonal of 5 feet 3/8 inch. What does that tell you?

The corner is more than 90 degrees. Cabinets can still go in, but the countertop must be cut to the real angle, and the gap shows up at the end of the run, where a scribed filler takes it.

5. The plan's run is 1/4 inch longer than the wall. Where does the 1/4 inch come from?

From the fillers. Scribe a filler narrower. Never shrink an appliance opening.

Key Takeaways

  • Find the floor's high point and measure every line up from it.
  • Base line at 34-1/2 inches and wall cabinet bottoms at 54 inches are common, but the maker's numbers control.
  • Check walls for plumb, flatness and square, and plan shims and fillers before you lift.
  • Every cabinet hangs on framing, so mark studs and confirm them.
  • Lay out from the real boxes and the appliance spec sheets, and keep appliance openings full size.