OSHA 30 Topic Tour - Construction
Tour the construction topics in a 30-hour course, from the Focus Four and the 1926 subparts to excavation, silica, cranes and a supervisor's duties.
Table of contents
The OSHA 30-Hour Construction course is aimed at people with safety responsibility: foremen, superintendents, lead workers and safety coordinators. Plenty of contracts and owners ask for it, and some states and cities require it for certain jobs. Like every OSHA Outreach card, it is not a certification and does not make you a competent person on its own. This tour shows what is different about construction, and what a supervisor is expected to do with that knowledge. It does not replace the course or your site's rules.
What You Will Be Able to Do
- Explain why construction has its own standards.
- Name the Focus Four, and give the main control for each.
- Find a topic in 29 CFR 1926.
- Say which jobs need a competent person.
- Use the soil slope table for a simple trench.
- Explain how silica's Table 1 works and what cranes need on site.
- Describe a supervisor's daily safety duties.
Why Construction Has Its Own Book
General industry rules are in 29 CFR 1910, and construction rules are in 29 CFR 1926. Construction is different because:
- The workplace keeps changing. Hazards on Friday may not have existed on Monday.
- Many employers share one site. Trades work on top of each other, and one crew's work can create another's hazard.
- Weather and ground matter. Rain changes a trench, and wind changes a lift.
Some 1910 rules also apply on construction sites, and OSHA has incorporated many of them into Part 1926.
The Focus Four
OSHA points to four hazards behind most construction deaths. Expect them to take up much of the course.
| Hazard | How it happens | Main controls |
|---|---|---|
| Falls | Edges, holes, roofs, ladders, scaffolds | Guardrails, covers, fall arrest, training |
| Struck-by | Vehicles, swinging loads, falling or flying objects | Hi-vis, spotters, exclusion zones, toeboards, tool lanyards |
| Caught-in or between | Trench collapses, unguarded machinery, pinned by equipment | Protective systems, guards, safe positions, lockout |
| Electrocution | Power lines, damaged tools, temporary power | Clearance, GFCIs, lockout, inspection of cords |
Your Map of Part 1926
| Subpart | Topic | Number to know |
|---|---|---|
| C | General safety and health provisions | Frequent inspections by a competent person |
| E | PPE | Employer pays for most required PPE |
| K | Electrical | GFCI or assured grounding on temporary power |
| L | Scaffolds | Fall protection at 10 feet |
| M | Fall protection | 6 feet |
| P | Excavations | Protective system at 5 feet |
| Q | Concrete and masonry | Guard protruding rebar against impalement |
| R | Steel erection | 15 feet, with connector rules |
| X | Stairways and ladders | Extend 3 feet above the landing |
| Z | Toxic substances | Silica is at 1926.1153 |
| AA | Confined spaces | Written program and permits |
| CC | Cranes and derricks | 10 feet from lines up to 50 kV, minimum |
The Supervisor's Role
A course like this is mostly about what you do with your authority. Workers will take their cue from you.
Competent Person Duties
A competent person can identify existing and predictable hazards, and has the authority to fix them right away. Many subparts require one, and on a small job, one foreman may fill several of these roles.
| Work | What the competent person does |
|---|---|
| Excavations | Classifies soil, inspects daily and after rain, removes workers if needed |
| Scaffolds | Supervises erection and changes, inspects before each shift |
| Fall protection | Trains workers, inspects systems, serves as safety monitor |
| Silica | Makes frequent inspections, carries out the written exposure control plan |
| Cranes | Inspects each shift, checks rigging and ground conditions |
| Ladders | Inspects for visible defects |
Your employer has to name you for the role and give you real authority. Taking a 30-hour course does not do that.
Daily Habits
- Plan the work. Walk the site, and review what changed since yesterday.
- Hold a short toolbox talk about today's hazards, and record it if that is your employer's practice.
- Check the high-risk items: edges, trenches, scaffold tags, cords and overhead lines.
- Coordinate with other trades, because their work can create your hazard.
- Correct problems on the spot, without blaming or making an example of anyone.
- Stop work if you must. If you let unsafe work go on, you have approved it.
- Report and record injuries and near misses.
On a shared site, more than one employer can be cited for a single hazard, including the one with general control of the site.
Excavations
Trench collapses often kill quickly, because a cubic yard of soil can weigh as much as a small car. The rules are at 1926.650 to 1926.652.
- A protective system is needed at 5 feet deep or more. It can also be needed in a shallower trench if a competent person sees signs of a cave-in. The exception is a trench entirely in stable rock.
- Options are sloping, benching, shoring and shielding (trench boxes).
- A registered professional engineer must design protective systems for excavations deeper than 20 feet.
- Keep spoil and equipment at least 2 feet from the edge.
- Provide a ladder, ramp or stairway within 25 feet of workers in trenches 4 feet deep or more.
- Test the air if a hazardous atmosphere could exist in an excavation deeper than 4 feet.
- A competent person inspects daily before work, after rain and whenever conditions change.
- Call 811 before digging, so that underground utilities can be located.
Soil Types and Slopes
| Soil type | Stability | Maximum slope (horizontal to vertical) | Angle |
|---|---|---|---|
| Stable rock | Solid rock | Vertical | 90 degrees |
| Type A | Most stable soil, such as clay | 3/4 to 1 | About 53 degrees |
| Type B | Medium | 1 to 1 | 45 degrees |
| Type C | Least stable, such as gravel or wet soil | 1-1/2 to 1 | About 34 degrees |
Worked example: A trench is 6 feet deep and 3 feet wide at the bottom, in Type C soil.
- Each side lays back 1.5 x 6 = 9 feet.
- Width at the top = 9 + 3 + 9 = 21 feet.
- If that is too wide for the site, you would need a trench box or shoring.
If nobody has tested the soil, treat it as Type C.
Silica
Cutting, drilling and grinding concrete, block, stone and brick all make respirable crystalline silica. It causes silicosis, lung cancer and other diseases, and the damage is permanent. Under 1926.1153:
- The exposure limit is 50 micrograms per cubic meter as an 8-hour average. The action level is 25.
- Table 1 lists common tasks with set controls, such as water or a vacuum shroud, and any respirator needed. If you fully follow Table 1 for a task, you do not need to measure the air for it.
- If a task is not on the list, or you cannot follow it, the employer must measure exposures and control them to the limit.
- Employers need a written exposure control plan, and a competent person to carry it out.
- Medical exams must be offered to workers who need a respirator for 30 or more days a year under the rule.
- Dry sweeping and compressed air cleaning are restricted.
Cranes and Rigging
The main rules are in Subpart CC.
- Operators must be certified or qualified through an approved route, such as an accredited testing organization.
- Signal persons must be qualified. They are needed when the operator cannot see the load or travel path, or when site conditions call for one.
- Riggers must be qualified when workers are in the fall zone during assembly or hooking up loads.
- Ground conditions must support the crane, and the controlling contractor is responsible for making sure of that.
- Inspections happen every shift, every month and once a year.
- Swing radius must be marked or barricaded to keep workers from being pinched or struck.
- Power lines need a plan before the crane sets up. The utility can deenergize and visibly ground the line. Or everything, including the load, stays 20 feet away from lines up to 350 kV. A third option uses a table of distances, which starts at 10 feet for lines up to 50 kV, once the voltage is confirmed with the utility.
- Under the load: keep workers out of the fall zone.
Rigging gear gets a check before each shift, and damaged slings are removed. Keep a load chart in the cab, and use it for every lift.
Other Topics You Will See
- Electrical. Temporary power needs GFCIs or an assured equipment grounding program. Use hard-service cords, and keep them out of water and off sharp edges.
- Scaffolds. They must support their own weight and at least four times the maximum intended load.
- Ladders. Inspect before use, secure them, and keep three points of contact.
- Hand and power tools. Keep guards in place, and use the right tool.
- Concrete and masonry. Guard rebar against impalement, and keep people out of the limited access zone next to a masonry wall going up.
- Forklifts. Operators must be trained and evaluated at least every 3 years.
- Heat. There is no federal heat rule as of late 2026, but the General Duty Clause applies, and several states have their own rules.
- Hazard communication. Think about products common on site, such as cement, spray foam, solvents, and lead or asbestos in older buildings.
Getting the Most From the Course
- Bring a real problem from your site.
- Ask for an explanation of what a citation would look like in your trade.
- Trade notes with the other students, because they work with the same subs and owners.
- Check whether the course is the one your owner or state accepts.
- Your card comes from the trainer or provider, usually within 90 days. Keep a copy.
Common Mistakes
| Mistake | What it costs | Better habit |
|---|---|---|
| Thinking the card makes you a competent person | Authority you do not have | Get named by your employer |
| Looking at the depth but not the soil | Sloping that fails | Classify the soil every time |
| Doing "almost" Table 1 | No exemption from air testing | Follow it fully or measure |
| Walking past a problem | Your crew learns it is fine | Correct it right away |
| Assuming the other trade will handle it | Citation for you, or injury | Coordinate and follow up |
Check Your Understanding
1. Your crew digs a trench 4 feet deep. The walls are cracking and a corner has fallen in. Is protection needed?
Yes. Under 5 feet, protection is still required if a competent person sees signs of a possible cave-in. Get people out.
2. A trench is 8 feet deep, with a 2-foot bottom, in Type B soil. How wide is it at the top?
Each side lays back 8 feet, so 8 + 2 + 8 = 18 feet.
3. A crew uses a saw with water, but the water feed is clogged and they keep cutting. Are they still following Table 1?
No. The control must work as written. Stop, fix the water, and do not continue until it runs.
4. A foreman has an OSHA 30 card. Can he classify soil on his own authority?
Only if he has the training and his employer has named him as the competent person with authority to act. The card does not do that.
5. A crane is setting up near a power line. The rigger says, "It looks like plenty of room." What is the right step?
Follow the power line procedure. Identify the voltage, confirm the distance and put the required controls in place before starting.
Key Takeaways
- The 30-hour card is for people with safety responsibility, and it is not a certification.
- The Focus Four are falls, struck-by, caught-in or between, and electrocution.
- Know the key numbers: 6 feet for falls, 5 feet for trenches, 10 feet for scaffolds.
- Slopes depend on soil, from 3/4 to 1 for Type A to 1-1/2 to 1 for Type C.
- Silica's Table 1 works only when you follow it exactly.
- Cranes need qualified people, solid ground and a power line plan.
- Supervisors set the standard by what they stop and what they walk past.