Repainting an Apartment Between Residents
Decide between touch-up and full repaint in a turn, follow the property's color standard, handle stains and resident colors, and paint a vacant apartment in an order that saves time.
Table of contents
Paint is the biggest visual part of almost every turn. It is also where a lot of turn time disappears. Touch up when the wall needed a full coat, and the new resident sees a patchwork of shades on move-in day. Repaint a whole apartment that only needed a few touch-ups, and you have spent a day and several gallons the property did not need to spend. This guide is about the decisions that are special to turns: how much to paint, what color and sheen, what to do about stains and resident colors, and how to move through an empty apartment quickly.
Brush and roller technique, such as cutting in, keeping a wet edge, and rolling a wall, is its own skill. This guide assumes you are learning it and focuses on the turn.
What You Will Be Able to Do
- Choose between touch-up, partial repaint and full repaint for a vacant apartment
- Read and follow a property paint standard
- Treat smoke, water, grease and marker stains so they do not bleed through
- Cover a resident's dark or bright paint color
- Paint a vacant apartment in an order that cuts wasted steps
The Property Paint Standard
Most apartment companies use one set of colors and products across a property, so touch-ups match and nobody has to guess. Ask for it in writing. A good standard lists each surface with its brand, product line, color name or code, and sheen.
| Surface | Common sheen | Why |
|---|---|---|
| Ceilings | Flat | Hides flaws and does not reflect light |
| Walls in living areas and bedrooms | Flat, eggshell or satin | Matches the standard so touch-ups blend |
| Kitchen and bath walls | Satin or semi-gloss | Stands up to moisture and scrubbing |
| Trim and doors | Semi-gloss | Durable and easy to wipe |
Sheen matters as much as color. A flat patch on an eggshell wall shows from across the room, even if the color code is the same. When you open a can, check the label against the standard before the first stroke.
If a property switches products, the new paint will not match the old walls exactly even with the same color code. Plan on full walls, or full rooms, in the new product.
Touch-Up or Full Repaint
Touch-up paint blends only when the wall is fairly new, clean, the same product and sheen, and lightly marked. Use the apartment's paint history if your property keeps one, and look at the walls in daylight.
| Condition | Choice |
|---|---|
| Last full paint was recent, a few small marks, same product | Touch up |
| Several patches on one wall | Repaint that wall corner to corner |
| Many patches across a room, or faded walls | Repaint the room |
| Long stay, or walls faded, dirty or yellowed throughout | Full repaint |
| Smoke, heavy grease or odor | Clean, stain-block, then full repaint |
| Resident painted an accent wall or room | Prime and repaint those walls, then match the room |
| Ceiling stain from a past leak | Confirm the leak is fixed and dry, stain-block, repaint the ceiling |
Many companies also set a policy, such as a full repaint after a set number of years of occupancy. Follow it. When a policy and the walls disagree, show your supervisor photos and let them decide.
Test before you commit. Touch up one spot in an inconspicuous place and let it dry fully. Look at it from the middle of the room and from the doorway, with the lights on and with daylight from the window. If you can find the patch from the doorway, you will be repainting that wall anyway.
Stains That Bleed Through
Water-based paint alone will not hold back many stains. They soak back through and show up after the paint dries, sometimes days later.
| Stain | Prep | Primer |
|---|---|---|
| Water stain on ceiling | Fix the leak, confirm dry with a meter | Stain-blocking primer, often oil-based or shellac |
| Cigarette smoke and nicotine | Wash walls and ceilings with a degreasing cleaner, rinse | Stain- and odor-blocking primer on every surface |
| Kitchen grease | Degrease, rinse, let dry | Bonding or stain-blocking primer as the label directs |
| Marker, crayon, pen | Wipe off what you can | Stain-blocking primer on the spot |
| Rust from a nail or bracket | Remove or set the fastener, sand | Stain-blocking primer |
| Fresh drywall compound | Sand smooth | Primer, so the patch does not look dull |
Ventilate when you use solvent-based primers, keep sparks and flames away, and follow the label and Safety Data Sheet for respirator use. Shellac and oil-based primers give off strong fumes, which is one reason they go on in a vacant apartment.
Covering a Resident's Color
Dark and bright colors take more coats than you expect, and painting the standard color straight over them wastes time.
- Clean the wall and fix holes as usual.
- Prime with a primer tinted toward the new color. A gray-tinted primer covers deep reds and blues faster than white.
- Apply two coats of the standard color.
- Check the edges where the dark wall meets the ceiling and the neighboring walls. That is where the old color peeks through.
Note it in the inspection so the office can apply the lease. Unapproved paint colors are often treated as damage, but that is the office's decision.
Painting a Vacant Apartment Fast
Speed in a turn comes from doing each type of task through the whole apartment at once, not finishing one room at a time.
- Clear and protect. Remove cover plates, tag them by room, and set them in a bag. Pull nails and anchors left by the resident. Lay drop cloths at walls if the floors stay.
- Protect what must not get paint. Cover smoke and carbon monoxide alarms with the bag or cap your site allows, and remove it the same day. Mask thermostats and door hardware, or remove the hardware.
- Patch everything. Fill every hole in the apartment in one pass. While the first coat of compound dries, move on to the next room.
- Sand and spot-prime everything. Sand all patches, then spot-prime patches and stains in one pass.
- Ceilings. Paint all ceilings first, so drips land on walls that are about to be painted.
- Walls. Cut in every room, then roll every room. By the time you finish rolling the last room, the first is often ready for its second coat. Check the label recoat time.
- Trim and doors. Paint trim and doors last, so wall rolling does not spatter fresh semi-gloss.
- Reset. Reinstall cover plates, remove every cover from alarms, pull tape, and clean up.
Some properties spray vacant apartments with an airless sprayer, which is faster but needs full masking and training. Never point a spray gun at anyone or put a hand in front of the tip, since the stream can inject paint under the skin.
Warning: Never paint a fire sprinkler head, even a little. A painted head may not open in a fire and has to be replaced by a sprinkler contractor. If your site allows covering heads while painting near them, remove every cover before you leave that day.
Lead in Older Buildings
In a building built before 1978, do not sand, scrape or heat old paint until you know whether it contains lead. Under the EPA's lead-safe rules, disturbing more than 6 square feet in a room or 20 square feet outside requires a certified firm and lead-safe practices, and federally assisted housing has added rules. Most turns repaint over sound paint without disturbing it, but patching, scraping peeling paint, and replacing trim can cross the line. Ask your supervisor before you start.
Estimating Paint for a Turn
Order enough before you start, so you do not run out in the middle of a wall.
Worked example. A bedroom is 11 feet by 12 feet with 8-foot ceilings. The wall area is the perimeter times the height: (11 + 12 + 11 + 12) x 8 = 46 x 8 = 368 square feet. Subtract a door, about 21 square feet, and a window, about 15 square feet, for 332 square feet. Two coats is 664 square feet. If the label says 350 to 400 square feet per gallon, plan on about 2 gallons for the walls of that room. The ceiling is 11 x 12 = 132 square feet, or under half a gallon per coat.
Use the coverage on your product's label, which changes with the surface and the color you are covering.
Checking the Finish
Before you call the paint done, walk each room with a bright work light held close to the wall and aimed along it. This raking light shows missed spots, roller marks, sags and patches that did not get primed. Also look at the wall from the doorway in normal light, which is how the resident will first see it. Fix misses before the cleaners and the carpet crew come in.
Keep leftover paint sealed and labeled with the apartment number, color, sheen and date, and dispose of unused paint by your site's rules and local law.
Common Mistakes
| Mistake | What it costs |
|---|---|
| Touching up with a different sheen | Shiny or dull patches the resident sees first |
| Latex straight over smoke or water stains | Stains bleeding back through new paint |
| Finishing one room before starting the next | Waiting on dry times instead of working |
| Trim before walls | Spatter on fresh trim and a second trim coat |
| Leaving covers on alarms or sprinklers | A safety device that may not work in a fire |
| Sanding old paint without checking for lead | Lead dust in a home and a federal violation |
Check Your Understanding
1. A resident lived in an apartment for four years. The walls are faded and have about a dozen patches in the living room. Touch-up or full repaint?
Full repaint, at least of the living room and probably the apartment. Touch-up paint will not blend on faded walls with that many patches.
2. You roll the standard wall color over a smoke-stained ceiling. Two days later, yellow spots show through. What went wrong?
The ceiling needed to be washed and sealed with a stain- and odor-blocking primer first. Water-based paint alone lets nicotine bleed through.
3. The bedroom has a navy blue accent wall. How do you cover it with the least wasted time?
Clean and patch, prime with a gray-tinted primer, then apply two coats of the standard color. Check the edges at the ceiling and corners for show-through.
4. You are painting a vacant two-bedroom alone. In what order do you work?
Clear and protect the whole apartment, patch everything, sand and spot-prime everything, then paint all ceilings, then all walls, then trim and doors, then reset plates and remove covers.
Key Takeaways
- Follow the property paint standard for product, color and sheen on every surface.
- Touch up only when the wall is fairly new, clean, the same product and lightly marked. Otherwise paint corner to corner.
- Wash and stain-block smoke, water, grease and marker stains before painting.
- Prime dark resident colors with a tinted primer, then apply two coats.
- Work by task across the whole apartment: patch, prime, ceilings, walls, trim.
- Never paint sprinkler heads or leave covers on alarms, and check for lead in pre-1978 buildings.