Skip to content
Skills / Preventive Maintenance / Preventive Maintenance Technician / Rigging, Slings, and Hand Signals
Preventive Maintenance

Rigging, Slings, and Hand Signals

15 min read Training Guide

Find a load's weight and center of gravity, choose and inspect slings, figure sling angle tension, rig and land a load safely, and give the standard crane hand signals.

Table of contents

Rigging is the work of attaching a load to a crane, hoist or other lifting device so it can be lifted and set down under control. When rigging fails, the load drops or swings, and anyone under it or beside it can be killed. Laborers, maintenance mechanics, millwrights and operators all help rig, whether the hook is on a mobile crane or a chain hoist over a pump.

Warning: Rigging and signaling take hands-on training, and some tasks require a formal qualification. In construction, OSHA requires a qualified rigger when workers hook, unhook or guide a crane load inside its fall zone, and a qualified signal person who has passed written or oral and practical tests. This guide teaches the basics. It does not qualify you.

What You Will Be Able to Do

  • Find or estimate a load's weight and center of gravity.
  • Choose a sling type and hitch, and read its tag.
  • Work out the tension in each sling leg at an angle.
  • Inspect slings and hardware and remove damaged gear.
  • Rig, lift, land and signal a load using standard practice.

Know the Weight

Never guess a weight. Find it, in this order of preference:

  1. The nameplate, shipping papers or the maker's data.
  2. Drawings and submittals.
  3. A calculation from size and material.
Material Approximate weight
Steel 490 pounds per cubic foot
Concrete About 150 pounds per cubic foot
Water 62.4 pounds per cubic foot, 8.34 pounds per gallon

Worked example. A steel plate is 4 feet by 8 feet and 1/2 inch thick. Its volume is 4 x 8 x (0.5 / 12) = 1.33 cubic feet. Its weight is 1.33 x 490 = about 653 pounds. Add the weight of the slings, shackles and any spreader bar, because the hoist lifts all of it.

Center of Gravity

The center of gravity is the balance point of the load. Rig so the hook sits directly above it. If the hook is off to one side, the load tilts when it leaves the ground, and the leg closest to the center of gravity carries more of the weight. Machinery is often heavier at the motor end, so look for marked lifting points and the maker's rigging diagram.

Sling Types

Sling Strengths Weak points
Wire rope Strong, handles heat and abrasion Kinks, broken wires, crushing
Alloy chain Tough, handles heat and rough loads Heavy, damaged by stretching and gouges
Synthetic web (nylon, polyester) Light, gentle on finished surfaces Cuts easily on edges, damaged by heat and some chemicals
Synthetic roundsling Flexible, gentle on loads Cuts on edges, exposed core yarns mean it is done

Use only chain slings made of alloy chain and tagged for overhead lifting. Transport chain and hardware-store chain are not slings. Each sling must carry a legible tag or marking with its rated capacity. No tag, no lift.

Hitches

The hitch is how the sling wraps the load, and it changes the capacity. The tag lists a separate rating for each hitch.

Hitch How it goes on Capacity
Vertical Straight from hook to one lifting point The basic vertical rating
Choker Wraps the load and passes through its own eye Lower than vertical, and lower again if the choke is pulled to a sharp angle
Basket Passes under the load with both eyes on the hook About twice vertical when the legs hang straight, and less as they spread

OSHA's sling guidance gives choker ratings for a choke angle of 120 degrees or more. A tighter choke needs the reduced value from the sling maker or a qualified person.

Sling Angles

When sling legs spread apart, each leg pulls sideways as well as up, so it carries more than its share of the load. The sling angle is measured between the leg and the horizontal.

Tension in each leg = (load / number of legs) x angle factor

Sling angle from horizontal Angle factor
90 degrees (vertical) 1.000
60 degrees 1.155
45 degrees 1.414
30 degrees 2.000

Worked example. A 1,200-pound motor is lifted with a two-leg sling. Each leg's share is 600 pounds.

  • At 60 degrees: 600 x 1.155 = 693 pounds per leg.
  • At 45 degrees: 600 x 1.414 = 848 pounds per leg.
  • At 30 degrees: 600 x 2.000 = 1,200 pounds per leg.

At 30 degrees, each leg carries the full weight of the motor. OSHA's sling guidance says not to use angles flatter than 30 degrees unless the sling maker or a qualified person approves, and many employers set a stricter limit. Use longer slings or a spreader bar to steepen the angle.

Inspection

Inspect slings and hardware before each use or each shift, and take damaged gear out of service right away. Tag it so nobody else uses it. Periodic inspections are also required and recorded, such as at least every 12 months for alloy chain slings.

Sling Remove from service if you see
Wire rope Broken wires (in general industry, 10 scattered in one rope lay or 5 in one strand in one lay), kinks, crushing, birdcaging, heat damage, corrosion, damaged end fittings
Alloy chain Stretched, bent, twisted, cracked, nicked or gouged links, wear beyond the maker's limit, missing tag
Synthetic web Cuts, tears, snags, holes, melting, charring, acid or caustic burns, broken or worn stitches, distorted fittings, missing tag
Roundsling Any core yarn showing through the cover, cuts, heat or chemical damage, missing tag

Many synthetic slings have red warning yarns inside. If red shows, the sling is done.

Hardware

  • Shackles. Use only rated shackles. Thread the pin fully and seat it, and never swap the pin for a bolt. Load the shackle in a straight line.
  • Hooks. Use hooks with a working safety latch. Seat the load in the bowl of the hook, never on the tip. Remove a hook that is opened more than 15 percent of its normal throat or twisted more than 10 degrees.
  • Eyebolts. Plain eyebolts are for straight vertical pulls only. Angled pulls need shouldered eyebolts or swivel hoist rings, at the reduced rating the maker gives, screwed in until the shoulder seats.

Rigging and Lifting a Load

  1. Plan. Know the total weight, the center of gravity, the path, the landing spot, and the hoist's or crane's capacity for that lift.
  2. Pick the gear. Choose slings and hitches with enough capacity at the real sling angle.
  3. Protect the slings. Pad sharp edges and corners with softeners. An unprotected edge can cut a synthetic sling in an instant.
  4. Rig it right. Never shorten a sling with a knot or a bolt. Do not twist or kink the legs.
  5. Keep hands clear of the space between the sling and the load as the slack comes out.
  6. Test lift. Raise the load a few inches and stop. Check balance, how the slings are seated, and the brakes. If it tilts, set it down and re-rig.
  7. Control it. Use a tag line, a rope tied to the load, to stop it from spinning. Never wrap a tag line around your hand or body.
  8. Stay out from under it. Keep everyone out of the fall zone, the area where the load or rigging could land if it fell. Travel the load low.
  9. Land on blocking. Set the load on cribbing or dunnage so the slings can come out without crushing a hand. Never use the crane to drag a sling out from under a load.
  10. No shock loading. Lift and lower smoothly. A jerk can multiply the force on the rigging.

Hand Signals

A signal person directs the operator when the operator cannot see the load or the path, or when the operator or the person handling the load decides one is needed. In construction, OSHA requires the standard hand signals and a signal person who has been tested and qualified.

  • Agree on one signal person. The operator follows only that person's signals.
  • Anyone can give stop or emergency stop, and the operator must obey it.
  • The hand signal chart must be posted on the equipment or near the lift.
  • Use radios when the operator cannot see the signal person, on a clear channel agreed on before the lift.
  • Overhead and gantry cranes in plants use a related chart that adds bridge and trolley signals. Use the chart posted at your site.
Signal How to give it
Hoist Forearm vertical, index finger pointing up, small horizontal circles
Lower Arm down, index finger pointing down, small horizontal circles
Stop One arm out to the side, palm down, swing it back and forth
Emergency stop Both arms out to the sides, palms down, swing them back and forth
Swing Arm out, index finger pointing the way the boom should swing
Raise boom Arm out, fist closed, thumb up
Lower boom Arm out, fist closed, thumb down
Extend boom Both fists at the waist, thumbs pointing outward
Retract boom Both fists at the waist, thumbs pointing at each other
Move slowly Hold one hand still in front of the hand giving the signal
Use main hoist Tap the top of your head, then give the regular signal
Use whipline Tap your elbow with the other hand, then give the regular signal
Dog everything, meaning lock all motions Clasp hands together at the waist

Common Mistakes

Mistake What it costs
Guessing the weight An overloaded sling or hoist
Ignoring the sling angle Legs carrying double their share
No padding on sharp edges A cut sling and a dropped load
Using a sling with no tag Unknown capacity
Standing under the load Crushed if anything fails
Several people giving signals Confused operator, wrong move

Check Your Understanding

1. A web sling's tag is missing, but the sling looks new. Can you use it?

No. Without the tag you cannot know its rated capacity. Take it out of service.

2. A 2,000-pound load is lifted with two legs at 45 degrees. What is the tension in each leg?

1,000 x 1.414 = 1,414 pounds per leg.

3. During a test lift, the load tilts toward one end. What do you do?

Lower it, then re-rig so the hook is over the center of gravity.

4. You are not the signal person, and you see a worker walk under the load. What can you do?

Give the stop signal. The operator must obey a stop from anyone.

Key Takeaways

  • Know the weight, add the rigging, and put the hook over the center of gravity.
  • Read the tag for each hitch, and remove any sling with no tag or with damage.
  • Flatter sling angles raise leg tension, and 30 degrees doubles it.
  • Pad edges, test lift, use tag lines, and stay out of the fall zone.
  • One signal person gives signals, but anyone can call stop.
  • Rigging and signaling need hands-on training, and crane work needs qualified people.