Roof Flashing Details

15 min read Training Guide

Build step, apron, kickout and counterflashing at walls and chimneys, install pipe boots and crickets, and lap every piece so water lands on top of the next one.

Table of contents

Most roof leaks do not start in the open field of shingles. They start where the roof stops: at a wall, a chimney, a pipe, a skylight. Those are the places where water has to change direction, and flashing is the metal or membrane that makes it turn. Flashing that is lapped the right way lasts as long as the roof. Flashing that depends on a bead of caulk lasts until the caulk cracks.

This guide covers flashing for asphalt shingle roofs. The 2021 International Residential Code (IRC) sets minimums in Sections R903 and R905.2.8, and for anything the code does not spell out, such as pipe boots and front walls, it sends you to the shingle maker's instructions. Numbers marked "one maker" come from a major shingle maker's printed details. The wall cladding maker and the skylight maker also have their own details, and the stricter rule wins.

What You Will Be Able to Do

  • Explain the lap rule that every flashing detail follows.
  • Weave step flashing up a sidewall and install a kickout at the bottom.
  • Flash a headwall, a chimney and a cricket.
  • Install a pipe boot so water lands on top of it.
  • Find the flashing mistake behind a leak.

The Lap Rule

Every piece must lap over the piece below it and under the piece above it, so water always lands on the top surface of the next layer. Before you fasten any piece, ask: when water runs down this, where does it go next? If the answer is "behind something," the order is wrong.

Code minimums that apply to every detail:

  • Flashing goes at every wall and roof intersection, every change in slope or direction, and around every roof opening (R903.2.1).
  • Metal flashing must be corrosion resistant and at least 0.019 inch thick, which is No. 26 galvanized sheet.
  • Sealant is a backup. It never replaces a lap.

Sidewalls and Step Flashing

A sidewall is a wall that runs up the slope beside the roof, such as the side of a dormer. It gets step flashing: one L-shaped piece per shingle course, with one leg on the roof and one leg up the wall.

The IRC requires sidewall flashing to be at least 4 inches high and 4 inches wide, to direct water onto the roof or into a gutter, and to run continuously behind the siding (R905.2.8.3). One maker's detail goes further:

Item One maker's detail
Roof leg 5 inches onto the shingle below
Wall leg 5 inches up the wall
Overlap between pieces 2 inches
Fasteners 2 nails per piece, into the deck, never into the wall
Membrane under it At least 5 inches up the wall
Siding At least 2 inches above the roof, lapping the flashing at least 2 inches

Weaving the Step Flashing

  1. Underlayment first. Run self-adhering membrane up the wall, then lap the field underlayment onto the roof.
  2. Kickout first. Install the kickout flashing at the bottom, where the eave meets the wall (see below).
  3. Lay a shingle. Lay the course shingle tight to the wall.
  4. Set a step. Place a step flashing piece on top of that shingle, just above its exposed edge, so the next course will cover it.
  5. Nail the roof leg only. Nail near the top of the roof leg, into the deck. A nail through the wall leg ties the flashing to the wall, which moves differently from the roof deck, and tears the flashing over time.
  6. Cover it. The next shingle course goes over the step flashing. Then the next step flashing goes on top of that shingle, lapping the one below.
  7. Repeat to the top, then lap the weather barrier and siding over the wall legs.

Worked Example: Sizing Step Flashing

The shingle exposure is 5-5/8 inches, and the maker wants each piece to lap the one below by 2 inches.

  • Each piece must reach from one course to the next and still overlap: 5-5/8 + 2 = 7-5/8 inches.
  • An 8-inch-long piece works, with 2-3/8 inches of overlap.
  • A 7-inch piece leaves only 1-3/8 inches of overlap, short of the maker's 2 inches.
  • With 5-inch legs each way, buy pieces made 5 x 5 x 8 inches, or bend your own from coil stock.

Never run one long piece up a sidewall under shingles. Water that gets on top of it runs straight down behind the shingles.

Kickout Flashing

Where a roof's eave stops against a wall that keeps going down, water running off the roof edge pours straight down the face of the wall. Over the years it soaks the sheathing and rots the wall from the inside. A kickout (diverter) is a bent piece at the bottom of the step flashing that turns that water out, into the gutter or away from the wall. The IRC requires a flashing that diverts the water away where the eave of a sloped roof meets a sidewall (R903.2.1).

  • Install it first, before the first step flashing, so the step flashing laps over it.
  • Lap the weather barrier and siding over its wall leg.
  • Never cut its diverter short to clear a gutter. Have the gutter installed to work with it.

Headwalls

A headwall is a wall at the top of a roof plane, such as where a porch roof meets the house. It gets one continuous apron flashing across its width.

  1. Shingle up to the wall, trimming the last course to fit.
  2. Run the apron over the top of the last course, with its wall leg up the wall. One maker calls for at least 5 inches up the wall, nailed to the deck and not to the wall.
  3. Cover the apron's roof leg with a strip cut from a shingle, set in asphalt cement instead of nails, as that maker shows, so no nail goes through the apron.
  4. Lap the weather barrier and siding down over the wall leg.

Where a headwall turns a corner into a sidewall, the apron end wraps around the corner and the first step flashing laps over it.

Chimneys

A masonry chimney needs two sets of flashing, because the roof and the chimney move separately.

  • Base flashing attaches to the roof: an apron across the front, step flashing up the sides, and a back pan or cricket behind.
  • Counterflashing attaches to the chimney and laps down over the base flashing, so the two can slide past each other. One maker calls for at least 4 inches of lap.

Counterflashing is set into a groove cut into a mortar joint, called a reglet, and sealed. Cutting the groove with a grinder makes silica dust, so use a tool with a shroud and vacuum, or water, as your silica plan requires.

One maker's details for the underlayment: membrane at least 5 inches up the chimney sides, and no felt or synthetic run up the chimney.

Crickets

A cricket (saddle) is a small peaked roof built behind a chimney to split the water around it. Without one, water and debris pile up against the back of the chimney. The IRC requires a cricket on the ridge side of any chimney or penetration more than 30 inches wide, measured across the slope (R903.2.2). It may be covered with sheet metal or the same material as the roof.

  • Small crickets can be one shop-bent metal piece. One maker's detail has the metal run at least 6 inches up the back of the chimney and at least 12 inches up the roof deck.
  • Large wood-framed crickets are treated like a small roof, with their own valleys, shingles and step flashing.

Pipe Boots

A pipe boot is a flashing with a flat base and a collar that seals around a vent pipe.

  1. Shingle up to the pipe from below.
  2. Cut the shingle that lands on the pipe so it fits around it.
  3. Slide the boot over the pipe so its base sits on top of the shingles below the pipe.
  4. Nail the upper corners of the base, where the next courses will cover the nails.
  5. Shingle the sides and top over the base. The base laps over shingles on the downhill side and under shingles on the sides and uphill side.

Size the boot to the pipe. A collar that fits loosely lets rain in around the pipe. Rubber collars break down in the sun before the shingles do, so check them every time you are on the roof. Caulk on a cracked collar is a temporary fix. Replace the boot.

Metal flues from furnaces and water heaters need the vent maker's flashing and storm collar and a set clearance to the roofing. Do not alter a flue or its clearance. That is HVAC or plumbing work.

Skylights and Other Penetrations

Use the skylight maker's flashing kit and follow their order. The IRC lets a skylight flashed to its maker's instructions skip the cricket rule. Curb-mounted vents, exhaust caps and satellite mounts each come with their own flashing details. Never mount anything with lag screws through shingles with only caulk around them.

Matching Metals

  • Do not let copper touch galvanized steel or aluminum, and do not let water run from copper onto them. The other metal corrodes.
  • Use nails that match the flashing metal, or that the flashing maker allows.
  • Lead flashing is soft and toxic. Wear gloves and wash your hands after handling it.

Tracing a Leak to the Flashing

Where the water shows Likely flashing problem
Wall below the lower end of a roof-wall joint Missing kickout
Ceiling along a dormer wall Step flashing missing, nailed to the wall, or one long piece
Under a porch roof at the house wall Apron lapped under the last course or nailed through
Around a chimney, worse in heavy rain Counterflashing surface-caulked, short laps, or no cricket
Around a vent pipe Cracked collar, or the base tucked under the downhill shingles
In the wall below a skylight Kit not used, or pieces out of order

Common Mistakes

Mistake What it costs
Nailing step flashing to the wall Flashing that tears as the house moves
Skipping the kickout A rotted wall hidden behind good-looking siding
Caulk instead of a lap A leak as soon as the caulk ages
Siding run down tight to the shingles Siding that wicks water and rots its bottom edge
No cricket behind a wide chimney Water and leaves pooled at the chimney
Reusing a cracked pipe boot A slow leak into the attic

Check Your Understanding

1. A dormer's step flashing was nailed through the wall legs into the studs. The roof is two years old, and the ceiling below is stained. What happened?

The roof and wall moved separately and tore the flashing at the nails. Step flashing gets nailed to the deck only.

2. A one-story roof ends against a two-story wall, and the wall below that point is soft and stained. What is missing?

A kickout flashing to divert water away from the wall where the eave meets it.

3. A chimney is 36 inches wide across the slope. Does the IRC require a cricket?

Yes. A chimney more than 30 inches wide needs a cricket on its ridge side.

4. Your exposure is 5-5/8 inches and the maker wants a 2-inch overlap between step flashing pieces. Will 7-inch pieces work?

No. 7 - 5-5/8 = 1-3/8 inches of overlap. Use 8-inch pieces.

5. A helper installs a pipe boot with the whole base tucked under the shingles on all sides. What is wrong?

On the downhill side, the base must sit on top of the shingles so water running off the boot lands on the roof, not under it.

Key Takeaways

  • Every piece laps over the one below and under the one above.
  • Step flashing is one piece per course, at least 4 inches each way by code, nailed only to the deck.
  • A kickout goes first, at the bottom of every roof-to-wall joint where the wall continues below.
  • Chimneys get base flashing on the roof and counterflashing set in the masonry.
  • Chimneys and penetrations wider than 30 inches need a cricket.
  • Sealant backs up a lap. It never replaces one.