Choose a liner or bonded membrane system, slope the floor to code, detail the drain, curb, corners, niche and valves, and pass a flood test before any tile goes in.

Table of contents

Tile and grout let water through. In a shower, the part that keeps water out of the framing is under the tile, and once tile covers it, nobody can see whether it was done right. A leaking shower pan rots subfloors, stains ceilings below and grows mold inside walls, often for months before anyone notices. The fix is tearing out the whole shower. That is why showers are planned, sloped and tested before tile.

Shower floors are plumbing fixtures under the plumbing code. Many places require a permit, an inspection of the pan, and a licensed plumber for the drain connection. The code your jurisdiction has adopted, and its local changes, win over anything here.

What You Will Be Able to Do

  • Explain how a traditional liner system and a bonded membrane system each handle water.
  • Lay out a floor slope that meets the code minimum and maximum.
  • Detail the drain, curb, corners, niche, bench and valve penetrations.
  • Run and record a flood test.
  • Name the places showers usually leak.

Two Ways to Waterproof

Traditional liner Bonded membrane
Where the waterproof layer is Under the mortar bed Right under the tile, on top of the sloped bed or board
What gets wet Tile, grout and the mortar bed above the liner Only tile and grout
How water leaves Through weep holes in the drain's lower flange Across the membrane to the drain's bonding flange
Needs a pre-slope under the liner Yes No. The membrane goes on the sloped surface
Typical materials PVC or CPE sheet liner Sheet or liquid membrane meeting ANSI A118.10, foam trays

Both work when built right. Each system has its own drain and its own details, so pick one and follow its maker's instructions from start to finish.

Warning: Do not stack a surface membrane on top of a traditional liner system unless the membrane maker approves that assembly. The mortar bed would sit between two waterproof layers, and water that gets into it has no way out.

What the Code Asks For

These figures are from the International Residential Code (IRC) sections on shower receptors and the shower liner test. The International Plumbing Code is similar. Check your local adopted code.

  • Floor slope: The finished floor slopes evenly to the drain, at least 1/4 inch per foot and no more than 1/2 inch per foot.
  • Curb: The curb is at least 2 inches and no more than 9 inches deep, measured from the top of the curb to the top of the drain. The finished top of the curb sits at least 1 inch below the sides and back of the shower.
  • Liner materials: Sheet lead, sheet copper, PVC sheet (ASTM D4551), CPE sheet (ASTM D4068), hot-mopped felt, or a bonded membrane meeting ANSI A118.10.
  • Liner extent: At least 2 inches beyond or around the rough jambs, and at least 2 inches above the finished threshold.
  • Liner slope: A liner slopes at least 1/4 inch per foot to the weep holes.
  • No holes low: The liner is not nailed or punctured anywhere less than 1 inch above the finished threshold.
  • Drain: A flanged drain with a clamping ring or other device that seals the liner, and weep holes into the drain.
  • Test: The completed liner is tested by plugging the drain and filling it with water at least 2 inches deep at the threshold for at least 15 minutes, with no leaks.

Some shower types, such as curbless showers built for accessibility, have their own code paths. Follow the design and the inspector.

Laying Out the Slope

With a center drain, most setters keep the perimeter of the floor level and let the slope vary. The longest run from the drain sets the height.

Worked example. A 36 x 48 shower has its drain in the center. The farthest point from the drain is a corner, 30 inches away. At 1/4 inch per foot, that corner must be at least 30 / 12 x 1/4 = 5/8 inch above the drain. Set the whole level perimeter at 5/8 inch above the drain. The nearest walls are 18 inches from the drain, so the slope there is 5/8 inch over 1.5 feet, or about 0.42 inch per foot. That is under the 1/2 inch per foot maximum, so the layout works.

If the steepest run would go over 1/2 inch per foot, move the drain or use a linear drain, which lets the floor slope in one plane toward one wall.

Mark the perimeter height on the walls with a level line before you mix any mortar.

Building a Traditional Liner Pan

  1. Block the framing. Add solid blocking between studs at the base of the walls and in the curb so the liner is supported and the wall board has backing.
  2. Set the drain base. Install the lower part of a clamping drain so its flange sits at the height the pre-slope needs. The drain-to-pipe connection is plumbing work.
  3. Pre-slope. Float a mortar bed sloped at least 1/4 inch per foot from the perimeter down to the drain's lower flange. The liner will follow this surface, so make it smooth, with no ridges or sharp stones.
  4. Place the liner. Lay the liner over the pre-slope. Fold the inside corners like the ends of a gift box instead of cutting them. Run the liner up the walls past the code height and over the curb.
  5. Fasten high only. Fasten the liner only at its top edge, on the studs. Never put a fastener in the curb top, on its inside face, or anywhere less than 1 inch above the finished threshold.
  6. Detail the curb corners. Where the liner is cut at the curb ends, seal preformed dam corners with the solvent cement the liner maker names.
  7. Connect the drain. Seal the liner to the drain's lower flange as the drain maker directs. Cut small holes only for the clamping ring bolts, then clamp the ring down. Cut out the drain opening last.
  8. Protect the weep holes. Set a weep hole protector or a small pile of pea gravel around them, so the mortar bed above does not plug them.
  9. Flood test before anything else goes on.
  10. Float the final bed. After the test passes, place the mortar bed on the liner, sloped to the drain, at the thickness the method calls for.

Wall board laps over the liner on the walls. Follow the method for where the board stops above the floor, and never drive fasteners through the liner low on the wall.

Building a Bonded Membrane Shower

  1. Build the sloped base. Float a sloped mortar bed directly on the subfloor, or use a pre-sloped foam tray made for the system.
  2. Install the drain that matches the membrane, with a bonding flange the membrane laps onto.
  3. Prepare the walls. Use a backer the membrane maker accepts. Do not hang plastic sheeting behind the board unless the maker approves, since the membrane on the face is already the barrier.
  4. Detail first, then cover the field. Do the corners, seams, drain and penetrations with the maker's preformed corners, bands and collars, then the flat areas.
  5. Install the membrane.
    • Sheet membranes go into thin-set with the notch the maker names. Embed them fully, and overlap seams by the amount the maker says.
    • Liquid membranes go on in the number of coats the maker requires, with reinforcing fabric where they say. Check thickness with a wet-film gauge, and let each coat dry to its color change or the stated time.
  6. Let it cure for the time on the label.
  7. Flood test.

Curbs, Niches, Benches and Penetrations

  • Curb. Wrap the waterproofing over the top and down the outside face. Pitch the top of the curb slightly toward the shower so water runs back in.
  • Shower door hardware. Drilling into the curb or a low wall punctures the waterproofing. Tell the glass installer where it is, and use the anchors and sealant the membrane maker approves.
  • Niche. Slope the bottom toward the shower, waterproof every face and inside corner, and use preformed corners or a preformed niche. Avoid niches in exterior walls where you can, since insulation and condensation make them harder to detail.
  • Bench. Slope the seat toward the shower and waterproof it as part of the wall and floor system.
  • Valves and shower arms. The plumber sets the valve at the depth its maker gives for the finished wall. Seal every pipe that passes through the waterproofing with the membrane maker's collar or the sealant they name.
  • Steam showers. Steam pushes moisture through ordinary membranes. Use a membrane the maker rates for steam use, and follow their ceiling and slope details.

Running a Flood Test

  1. Wait for cure. Let the membrane, sealants and solvent welds cure for the time their makers give.
  2. Plug the drain. Use a test plug that seals below the waterproofing, so the water is held by the liner or membrane and not by the plug alone.
  3. Dam the threshold if needed. If the curb is too low to hold 2 inches of water, build a temporary dam.
  4. Fill. Fill to at least 2 inches deep at the threshold. Mark the water line with tape or a marker.
  5. Wait. The IRC minimum is 15 minutes. Many inspectors and membrane makers ask for 24 hours. Use whichever is longer.
  6. Check. The water line should not drop. Look below the shower, at the ceiling, subfloor or crawlspace, and at the outside of the curb.
  7. Record. Photograph the water line at the start and end with the time showing. Get the inspection if your jurisdiction requires one.
  8. Drain and remove the plug carefully, without damaging the drain or membrane.

If the level drops, find the leak, repair it the way the maker says, and test again. Never tile over a pan that has not passed.

Where Showers Leak

Spot Why it leaks Prevention
Drain connection Liner not clamped or sealed, membrane not lapped on the flange Follow the drain maker, test before tile
Curb corners Cut liner without sealed dam corners Preformed corners, solvent-welded or sealed
Curb top Nails or door screws through the waterproofing Fasten high on studs, coordinate with the glass installer
Inside corners and seams Gaps or thin membrane at changes of plane Preformed corners, full overlaps, wet-film checks
Valve and arm Pipe passes through unsealed Collars or approved sealant
Niche Flat or back-sloped bottom, unsealed corners Slope out, waterproof every face
Weep holes Plugged by mortar, so water sits in the bed Protector or pea gravel

After the Test

The tile still matters. Set it with 95 percent mortar coverage, the minimum for showers, and use a flexible sealant, not grout, where the walls meet the floor and at inside corners.

Warning: PVC solvent cements and some membrane products give off strong vapors and are flammable. Ventilate the bathroom, keep flames and sparks away, and read the safety data sheet.

Check Your Understanding

1. A shower's drain is 40 inches from the farthest corner. How high above the drain must that corner be at the minimum slope?

40 / 12 x 1/4 = about 0.83 inch, so a little over 13/16 inch.

2. A helper staples a PVC liner to the inside face of the curb to hold it in place. What is wrong?

The liner must not be nailed or punctured anywhere less than 1 inch above the finished threshold. Those staples make holes below the water line. Fasten only at the top edge on the studs.

3. You plan a traditional liner pan. Can you paint a liquid membrane on top of the mortar bed for extra protection?

Not unless the membrane maker approves that assembly. The mortar bed would be trapped between two waterproof layers.

4. The flood test water line dropped by a visible amount overnight, and there is a damp spot on the ceiling below. What happens next?

Drain it, find and repair the leak, and test again. Do not tile until it passes.

5. With a level perimeter, your layout gives 0.6 inch per foot at the nearest wall. Is that acceptable?

No. The code maximum is 1/2 inch per foot. Move the drain, use a linear drain, or change the layout.

Key Takeaways

  • Pick one system, liner or bonded membrane, and follow its maker all the way.
  • Slope floors between 1/4 and 1/2 inch per foot to the drain.
  • Keep fasteners out of the liner below 1 inch above the finished threshold.
  • Detail drains, curbs, corners, niches and pipes before the flat areas.
  • Flood test at least 2 inches deep, for at least 15 minutes and often 24 hours, and record it.
  • Never tile over a pan that has not passed.