Electrical
Residential Wiring
Pulling NM-B cable, installing boxes, mounting devices, and landing wires on panels for single-family and multi-family housing. Covers both the rough-in stage before drywall and the trim stage when outlets, switches, and fixtures go in. Work must meet NEC requirements and pass municipal inspection.
1
path
4
guides
Learning Paths
Choose a path that matches your experience level and work toward mastery at your own pace.
Beginner Friendly
1 path
Start here
Rough in a dwelling unit per NEC: branch circuit ampacity at 14/12/10 AWG, continuous load sizing at 125 percent, 210.8 GFCI and 210.12 A...