A ledger is the board bolted to the house that carries one end of the deck joists. When a ledger lets go, the whole deck drops at once, often with people on it. Ledgers fail in two ways: the fasteners were wrong or too few, or water got behind the board and rotted the house framing it was bolted to. This guide covers both.

The rules here come from Section R507 of the International Residential Code (IRC) and the American Wood Council's deck guide, DCA 6. Towns adopt different IRC editions, and the tables change between them, so the permit set and your building department win. Most towns require a permit and inspections. Questions the code tables do not answer go to an engineer.

What You Will Be Able to Do

  • Decide whether a wall can take a ledger, or whether the deck must stand on its own.
  • Set the ledger height from the door threshold.
  • Flash the ledger so water runs out over it instead of behind it.
  • Lay out lag screws or bolts at the spacing and edge distances the code requires.
  • Explain what the lateral load connection is and where it goes.

Terms

Term Meaning
Band joist The house's rim board that the ledger bolts to
Sheathing Plywood or OSB on the outside of the house framing
WRB Water-resistive barrier, such as housewrap or felt
Lag screw A heavy screw with a hex head, driven with a wrench
Through-bolt A bolt that passes all the way through, with a nut and washer
Free-standing deck A deck held up by its own beam and posts at the house side

Can This Wall Take a Ledger?

Look before you plan. From the basement or crawlspace, find the band joist behind the ledger location. Pull a piece of siding if you have to.

What you find Ledger allowed?
Solid 2x band joist sitting on a sill or wall plate Yes, per the code table
Engineered rim board at least 1 inch thick Yes, with the rim maker's or an engineer's spacing
Brick, stone or other masonry veneer No. Build a free-standing deck
Hollow concrete block No
Floor that cantilevers past the foundation, or a bay window No
Floor trusses with only a 2x4 ribbon at the ends Not without the truss designer's detail
Solid concrete foundation wall Yes, with approved expansion or adhesive anchors
You cannot see or verify the framing Build a free-standing deck

The IRC says that where a positive connection to the house cannot be verified during inspection, the deck must be self-supporting. A free-standing deck puts a beam on posts close to the house instead of a ledger. Under DCA 6, a free-standing deck still ties to the house for lateral loads, and its footings within 5 feet of a house foundation must bear at the same elevation as the house footing, because the soil next to a basement wall is loose backfill.

The ledger itself must be at least a 2x8 of pressure-treated or naturally durable No. 2 lumber. DCA 6 also asks for a ledger at least as deep as the deck joists and no deeper than the house band joist. A ledger may not carry the end of a beam or girder. Beams get their own posts.

Setting the Height

The ledger height comes from the door. Under the IRC, the deck surface outside an exterior door can be no more than 1-1/2 inches below the top of the threshold where the door swings over the deck. Where the door does not swing out over it, the step down can be up to 7-3/4 inches. A small step down keeps rain and snow from running under the door.

Worked example. Joists hang flush with the top of the ledger, and the decking is 1 inch thick. You want the deck surface 1 inch below the threshold.

  1. Ledger top = threshold - 1 inch step - 1 inch decking.
  2. So the top of the ledger sits 2 inches below the top of the threshold.

Now check that this height lands the ledger on the band joist with room for the fasteners. Measure down from the finished floor inside to find the band. If the ledger would hang below it, change the deck height within the step limit, or change the design.

Snap a level line on the wall for the top of the ledger.

Preparing the Wall

DCA 6 requires the siding to come off where the ledger goes. A ledger bolted over siding traps water and leaves a weak, crushed connection.

  1. Snap lines for the cut, a few inches above and below the ledger and past each end.
  2. Set a circular saw to the siding depth only, and cut the siding without cutting the sheathing.
  3. Remove the siding. Keep the WRB above the cut intact.
  4. Inspect the sheathing and band joist. Soft or stained wood means water has been getting in. Stop and get the rot repaired before you build on it.
  5. From inside, check for wires, pipes, dryer vents or a hose bib in the band where you will drill. Move your layout to miss them.

On a house built before 1978, assume the paint on the siding contains lead until a test shows otherwise, and follow lead-safe work rules when you cut it.

Flashing the Ledger

Flashing works on the shingle-lap rule: each layer laps over the one below it, so water always runs out and down. Approved corrosion-resistant flashing is required at a ledger on a wood-framed wall. The IRC asks for metal flashing at least 0.019 inch thick, or an approved nonmetallic material compatible with the house and the decking.

  1. Membrane behind. Apply a strip of self-adhered flashing membrane to the sheathing over the ledger area. Slit the WRB above and tuck the top of the membrane under it.
  2. Set the ledger. Hold it to the level line with temporary screws or a couple of blocks, then fasten it as shown below.
  3. Cap flashing over. Install a Z-shaped or cap flashing that runs up the wall behind the WRB and over the top of the ledger, with a drip edge that sheds water past the ledger face. Newer IRC editions set minimum sizes for this flashing, including running at least 2 inches up the wall above the ledger. Follow the detail in the code your town adopted.
  4. Tape the WRB back down over the flashing's top leg.
  5. Reinstall siding with a small gap above the flashing. Do not caulk the bottom edge of the siding to the flashing, because that seals water in.

Keep plain aluminum flashing away from copper-based treated lumber, such as ACQ or copper azole. The copper corrodes it. Use flashing rated for contact with treated wood, such as vinyl, copper, stainless steel or a product labeled for it.

The door threshold above the deck is a common leak point. Flash and seal it at the same time.

Fasteners

The code is narrow about what can hold a ledger. Use only these:

  • 1/2-inch lag screws with washers, when you cannot reach the inside of the band.
  • 1/2-inch through-bolts with washers at the head and nut, when you can reach inside.
  • 1/2-inch expansion or adhesive anchors into a solid concrete wall, spaced and embedded as the anchor maker says.
  • Proprietary structural ledger screws, only if they have a code evaluation report that covers deck ledgers, you install them exactly as that report says, and your inspector accepts them.

Ledger fasteners must be hot-dipped galvanized or stainless steel. Nails and toenails are not allowed for the house connection. DCA 6 bans lead anchors.

Spacing

The code table sets on-center spacing by joist span and fastener type. Longer joists put more load on the ledger, so the fasteners get closer together. For example, in the 2018 IRC table, 1/2-inch lag screws through no more than 1/2 inch of sheathing are spaced 15 inches on center for joist spans from 10 feet 1 inch to 12 feet. DCA 6 gives the same 15 inches for that case. Read the table in your adopted edition, since snow loads and newer editions change the numbers.

Worked example. A ledger is 14 feet (168 inches) long, joists span 12 feet, and you use lags at 15 inches on center.

  1. Start the first lag 3 inches from one end. The code end distance is 2 inches minimum and 5 inches maximum.
  2. Continue every 15 inches: 3, 18, 33 and so on up to 153 inches. That is 11 lags.
  3. The next mark would be 168, right at the end. Place one more at 165 inches, 3 inches from the far end. The gap from 153 is 12 inches, under 15, so it passes.
  4. Total: 12 lags, staggered high and low along the ledger.

Edge Distances

Fasteners too close to an edge split the wood. The IRC table gives minimums for both boards:

Board Top edge Bottom edge Ends
Ledger 2 inches 3/4 inch 2 inches
Band joist 3/4 inch 2 inches 2 inches

Rows are staggered top and bottom along the ledger. The two rows must sit at least 1-5/8 inches apart and no more than 5 inches apart. The code figure also sets a minimum distance from the top of the ledger down to the bottom row, so read it before you drill.

Worked example. A 2x8 ledger (7-1/4 inches deep) goes on a 2x10 band joist (9-1/4 inches deep), with the ledger's top 1 inch below the band's top. Measure everything down from the top of the band.

  • The top row must be at least 2 inches below the ledger top: 1 + 2 = 3 inches down. That is well over the band's 3/4-inch top minimum.
  • The ledger bottom is at 1 + 7-1/4 = 8-1/4 inches. The bottom row must be at least 3/4 inch above it, so no lower than 7-1/2 inches.
  • The band bottom is at 9-1/4 inches, and the bottom row must be at least 2 inches above it, so no lower than 7-1/4 inches. The tighter limit wins: 7-1/4 inches.
  • Row spacing: 7-1/4 - 3 = 4-1/4 inches. That is between 1-5/8 and 5 inches, so it works.

Installing Lags and Bolts

  1. Lags. Drill a 1/2-inch hole through the ledger. Then drill a 5/16-inch pilot into the band joist. Do not drill a 1/2-inch hole into the band, or the threads have nothing to bite.
  2. Pick a lag long enough that the threaded tip passes fully through the inside face of the band. With a 2x ledger, 1/2-inch sheathing and a 2x band, that means longer than 3-1/2 inches.
  3. Turn the lag in with a wrench or impact driver, with a washer under the head. Never hammer a lag. Snug it until the washer seats, and stop before it crushes the wood.
  4. Through-bolts. Drill 17/32 to 9/16 inch, and put a washer under both the head and the nut.

Warning: A ledger is heavy and awkward on a ladder. Lift it with two people, support it on blocks or temporary screws before you drill, and follow fall protection rules once the deck framing is more than 6 feet up.

The IRC table lets up to 1/2 inch of stacked washers stand in for part of the allowed sheathing thickness, which leaves a drainage gap. It applies only over wood structural panel or lumber sheathing, not foam or gypsum.

The Lateral Load Connection

The ledger holds the deck up. A separate connection keeps it from pulling away from the house sideways. Under the IRC, you install hold-down tension devices that tie the deck joists through the band to the house floor framing. Two options are allowed:

Option Devices Capacity each
Figure R507.9.2(1) At least 2, within 24 inches of each end of the deck 1,500 pounds
Figure R507.9.2(2) At least 4 750 pounds

These need access inside the house to fasten to the floor joists or blocking. Use the device maker's instructions and the code figure, and fasten only to framing, never to brick veneer.

Common Mistakes

Mistake What it costs
Ledger bolted over siding Rot behind the board and a crushed, loose connection
Nails instead of lags or bolts A deck that can pull off the house
No flashing, or flashing caulked at the bottom Rot in the band joist
Ledger on brick veneer or a cantilevered floor A connection that can fail without warning
1/2-inch hole drilled into the band Lags that strip and never tighten
Skipping the lateral ties A deck that can rack away from the house

Check Your Understanding

1. The back of a house has brick veneer where the deck will go. What do you build?

A free-standing deck with its own beam and posts near the house. Ledgers may not be supported on stone or masonry veneer.

2. The threshold is at a set height, joists hang flush with the ledger top, decking is 1 inch thick, and you want a 1-1/2-inch step down. Where is the ledger top?

2-1/2 inches below the top of the threshold: 1-1/2 inches of step plus 1 inch of decking.

3. A helper drills 1/2-inch holes through the ledger and into the band joist, then drives lags. What is wrong?

The band needs a 5/16-inch pilot. A 1/2-inch hole in the band leaves the threads nothing to grip.

4. Water has stained the inside of the band joist on an old deck you are replacing. What do you do before the new ledger goes on?

Find the rot and get the band joist repaired first. Then flash the new ledger correctly so the leak does not return.

Key Takeaways

  • Look at the house framing first. If you cannot verify it, the deck stands on its own.
  • Remove the siding, flash with the shingle-lap rule, and keep the drip edge clear.
  • Use 1/2-inch lags or through-bolts, hot-dipped galvanized or stainless, at the spacing in your adopted table.
  • Respect edge distances on both boards, and stagger the rows.
  • Add the lateral hold-downs that tie the deck to the house floor framing.