Lay out a deck, size and dig its footings, set posts and beams, and hang joists at spans and spacings your adopted code allows.

Table of contents

A deck carries people, furniture, grills and snow on a frame that sits outside in the weather. Every pound travels the same path: decking to joists, joists to the beam and ledger, beam to posts, posts to footings, footings to the soil. If one link in that chain is too small or badly connected, the deck sags, bounces or fails. This guide walks the chain from the ground up.

The rules come from IRC Section R507 and the American Wood Council's DCA 6 deck guide. The span and footing tables differ between code editions and with snow load, so this guide teaches how to read them and gives examples, but your adopted code, the approved plan and the inspector decide. Decks that carry a hot tub, very heavy snow or other unusual loads fall outside the prescriptive tables and need an engineer.

What You Will Be Able to Do

  • Trace the load path and work out what each post carries.
  • Lay out footings and dig them to the required depth.
  • Set posts and connect beams so they cannot slide off.
  • Read a joist span table and work out the allowed cantilever.
  • Hang joists with the right connectors and fasteners.

Before You Dig

  1. Get the plan approved. DCA 6 describes a framing plan that shows the deck size, joist and beam layout, ledger, posts, footings and fastener spacing. Most towns want this with the permit.
  2. Know the loads. Prescriptive tables assume about 40 pounds per square foot (psf) of live load plus 10 psf of dead load. In snow country, the IRC requires the deck to be designed for the ground snow load when that is greater.
  3. Call 811 a few business days before digging, wait for every utility to mark, and hand dig near the marks. Private lines, such as a gas line to a grill or a sprinkler main, are not marked by 811.
  4. Avoid what you cannot build over. DCA 6 says not to put footings over septic systems or leach fields, utility lines, or enclosed meters.

Layout

  1. Set the ledger first, or mark the house-side beam line for a free-standing deck. Every other measurement comes off it.
  2. Build batter boards past each outside corner and run string lines for the beam's outside face and the deck's ends.
  3. Square the strings with a 3-4-5 triangle or a larger multiple, and confirm the diagonals match.
  4. Mark each post center on the strings and drop a plumb bob to the ground. Set a stake at each footing.
  5. Pull the strings aside while you dig, and put them back to set posts.

Footings

How Deep

Under the 2021 IRC, deck footings go at least 12 inches below undisturbed ground. Where the deck is attached to a house that is protected from frost, the footings must also be protected from frost, usually by extending them below the local frost line. The frost line is the depth to which soil freezes in winter, and your building department publishes it. Soil that freezes under a footing swells and can lift the deck out of line.

The 2021 IRC drops the footing requirement for some small, low, free-standing decks, such as one of 200 square feet or less whose joists bear on pier blocks at grade and whose surface is no more than 20 inches above grade. Older editions word these exceptions differently, so check yours.

Two more depth rules matter near the house:

  • Within 5 feet of a house foundation, DCA 6 requires deck footings to bear at the same elevation as the house footing. The soil beside a basement wall is loose backfill.
  • Undisturbed soil means ground that has never been dug. A footing on fill can settle.

How Big

A footing must spread the post's load over enough soil. The IRC sizes footings in Table R507.3.1 by the post's tributary area, the patch of deck surface that the post holds up, and by the soil's bearing value. The idea behind the table is simple arithmetic.

Worked example. Joists span 12 feet from the ledger to the beam and cantilever 2 feet past it. Beam posts sit 8 feet apart.

  1. An inside post holds 4 feet of beam on each side, so 8 feet along the beam.
  2. Out from the house, it holds half the joist span plus the cantilever: 6 + 2 = 8 feet.
  3. Tributary area = 8 x 8 = 64 square feet.
  4. Load = 64 x 50 psf = 3,200 pounds.
  5. On soil rated at 1,500 psf, the footing needs 3,200 / 1,500 = about 2.1 square feet of bearing, which is a round footing about 20 inches across.
  6. A corner post carries only half the beam length, so about 32 square feet and 1,600 pounds.

This shows why footings grow with span. Size the real footing from your adopted table. Tables also count the footing's own weight and the largest overhangs allowed, so their answer is often bigger. For this case, DCA 6's table calls for a 24-inch round footing.

A cardboard tube form makes a pier, not a footing. A 10-inch tube alone gives a 10-inch bearing area. Pour the required footing pad at the bottom of the hole, or use a footing form that flares to the needed size.

Digging and Pouring

  1. Dig to depth with straight sides, and keep loose soil out of the bottom.
  2. Many towns inspect the open holes before concrete. Schedule it.
  3. Pour the footing and set the post base anchor, or set the pier form on the fresh footing.
  4. Center each anchor on its string mark, square it to the beam line, and set its height so the post will bear fully.

Posts

DCA 6 calls for posts of 6x6 or larger, and that is the common choice. The IRC post table allows smaller posts only at short heights. Post height is measured from the top of the footing to the underside of the beam, and every post table limits it.

  • Use lumber rated for ground contact wherever it touches soil or sits in concrete that touches soil.
  • Fasten the post to the footing with a manufactured post base, or embed it at least 12 inches in soil or a concrete pier, as the IRC allows. Do not rely on soil for side support where the soil is expansive or shifting.
  • Center posts on their footings.
  • Brush a preservative such as copper naphthenate on every cut end and notch in treated lumber, as the code requires.

Cut posts to height after they are set. Run a level line or a laser from the ledger, subtract the joist depth if the joists bear on top of the beam, and subtract the beam depth.

Beams

A beam is usually two or three 2x boards nailed together, or a solid timber. Find its allowed span in the beam table, using the beam size, species and the joist span it carries.

Worked example. A two-ply southern pine 2x10 beam carries joists that span 12 feet. The 2018 IRC beam table allows 7 feet 4 inches between posts. DCA 6, based on the 2015 IRC, lists 7 feet 1 inch for the same beam. Tables change between editions, so use the one your town adopted.

Rules for building the beam:

  • Nail the plies together with two rows of 10d (3-inch x 0.128-inch) nails at 16 inches on center along each edge, per the IRC, or as your plan shows.
  • Set the crown up, and land any splice in a ply directly over a post.
  • A beam may cantilever past its end post up to one-fourth of the span next to it.
  • Each beam end needs at least 1-1/2 inches of bearing on wood or metal, and 3 inches on concrete or masonry.
  • Where a multi-ply beam crosses a post, every ply must bear fully on it.

Beam to Post

The beam must sit on the post, not hang off the side of it.

  • Notched post. Cut a notch in a 6x6 so the beam bears on the notch, and through-bolt it with two 1/2-inch bolts with washers under the head and nut.
  • Post cap. Use a manufactured cap sized for both the post and the beam. DCA 6 requires a cap for three-ply beams.
  • Not allowed under DCA 6: bolting a beam to the side of a post with no notch. The bolts alone carry the whole load and can split out.

DCA 6 also calls for diagonal braces on corner posts taller than 2 feet, fastened with 1/2-inch lag screws. The IRC does not prescribe them, so follow your plan and inspector.

Joists

Span and Cantilever

Joist span is measured from the face of one support to the face of the other. It does not include the cantilever past the beam.

Worked example. From DCA 6's joist table, southern pine 2x10 joists at 16 inches on center may span up to 14 feet, with an overhang of up to 3 feet 5 inches. Your joists span 12 feet.

  1. 12 feet is under 14 feet, so the span works.
  2. The overhang is limited to the lesser of the table value and one-fourth of the actual span. 12 / 4 = 3 feet.
  3. 3 feet is less than 3 feet 5 inches, so the joists may cantilever 3 feet.

Spacing

The decking also limits joist spacing. In the IRC decking table:

Decking Perpendicular to joists Diagonal to joists
1-1/4-inch wood (5/4) 16 inches 12 inches
2-inch wood 24 inches 16 inches
Plastic composite As its label says As its label says

If you plan 5/4 boards on a diagonal, the joists must be 12 inches on center even if the span table would allow wider.

Hangers and Connections

  1. Hangers. Joists that frame into the side of a ledger or beam need approved joist hangers. Joist hangers or blocking used for lateral restraint must be at least 60 percent of the joist depth.
  2. Fasteners. Fill every nail hole with the exact fastener the hanger maker lists. Deck screws and drywall screws are not hanger nails.
  3. Coating. Connectors touching treated wood must meet the maker's coating rules, or at least G185 galvanizing, or be stainless steel. DCA 6 calls for stainless type 304 or 316 within 300 feet of salt water. Do not mix stainless and galvanized parts in one connection.
  4. On top of a beam. A joist bearing on a single-ply beam needs a mechanical connector. On a multi-ply beam, nail it as the IRC fastener schedule shows, or use hurricane ties. Add blocking between joists over the beam when they cantilever.
  5. Rim joist. Fasten the rim to each joist end with at least three 10d nails or three No. 10 x 3-inch wood screws.
  6. Layout. Pull 16-inch layout from the same end on the ledger and the beam, crown every joist up, and keep joists from framing in from opposite sides of the same beam, which DCA 6 does not allow.

Before decking goes on, most towns do a framing inspection. Leave everything visible until it passes.

Common Mistakes

Mistake What it costs
Footing above the frost line Posts heave and the deck racks
Tube form with no footing pad A footing too small for the load
Beam bolted to the side of posts Bolts split out under load
Overhang longer than one-fourth the span A bouncy edge and an overstressed joist
Wrong nails or empty holes in hangers Hangers that pull loose
Using the span table from another edition A frame that fails inspection

Check Your Understanding

1. Joists span 10 feet and the span table allows an overhang of 2 feet 10 inches. How far can they cantilever?

2 feet 6 inches. One-fourth of 10 feet is 2-1/2 feet, which is less than the table value.

2. Beam posts are 6 feet apart, joists span 10 feet with no cantilever. What is an inside post's tributary area?

6 x 5 = 30 square feet: 6 feet along the beam and half the 10-foot joist span.

3. You plan 5/4 composite boards on a diagonal. Where do you find the joist spacing?

On the decking's label or installation instructions. Composite decking spans come from the maker's tested rating, not the wood rows of the table.

4. A footing sits 3 feet from a house with a full basement. How deep does it go under DCA 6?

Down to the elevation of the house footing, because it is within 5 feet of the foundation, where the soil is backfill.

Key Takeaways

  • Follow the load path, and size each part for what it carries.
  • Footings go at least 12 inches into undisturbed soil, and below the frost line where the code requires.
  • Size footings from your adopted table, and pour a real pad, not just a tube.
  • Beams sit on posts in a notch or a cap, never bolted to the side alone.
  • Cantilevers stop at one-fourth of the span or the table value, whichever is less.
  • Fill every hanger hole with the maker's fastener, in a coating rated for treated wood.